Date Text
2026-04-15 14:40:45.00000SHEET PV-3:
 1] SHOW CONDUCTOR #10 OCPD AS 60A*
 2] SHOW CONDUCTOR #12 OCPD AS 60A*
 3] SHOW CONDUCTOR #12 AS THREE CURRENT-CARRYING
 CONDUCTORS AND REMOVE EQUIPMENT GROUNDING CONDUCTOR.
 FOR SUPPLY-SIDE TAP, NEUTRAL IS BONDED IN PV DISCONNECT
 AND AN EGC SHOULD NOT BE INSTALLED, 250.25.
 4] TRIANGLED NOTE #10, 12, & 13 ARE IN THE WRONG
 LOCATIONS ON THE ONE-LINE DIAGRAM, CORRECT AS
 NECESSARY.
 5] TRIANGLED NOTE #11 IS SHOWN IN TWO INCORRECT
 LOCATIONS ON THE ONE-LINE DIAGRAM, CORRECT AS
 NECESSARY.
 *PLEASE CLARIFY: THE COMBINED INPUT OF PV + ESS WOULD
 REQUIRE A 70A OCPD AND #4 CU UNLESS A PCS FEATURE IS
 INTENDED TO BE USED WITH OR INCORPORATED WITHIN THE IQ
 SYSTEM CONTROLLER. IF SO, THE PCS MUST LIMIT THE OUTPUT
 TOWARD THE MAIN SERVICE TO 48 AMPS. ADJUST PLANS OR
 SPECIFY ACCORDINGLY.