Date Text
2025-10-24 13:44:49.000001] PROFESSIONAL ENGINEER SEAL IS REQUIRED ON SUBMITTED
 PLANS
 2] SHEETS PV-4, PV4B, PV-4C, PV-4E: IN CONDUCTOR
 SCHEDULE AT TOP OF SHEET, REMOVE THE EQUIPMENT
 GROUNDING CONDUCTOR SHOWN WITH THE SUPPLY-SIDE TAP SET.
 SYSTEM WILL BE BONDED BY THE NEUTRAL PER 250.25 (A).
 3] SHEETS PV-4A, PV-4D, PV-4F: IN CONDUCTOR SCHEDULE AT
 TOP OF SHEET, REMOVE THE EQUIPMENT GROUNDING CONDUCTOR
 SHOWN WITH THE SERVICE-ENTRANCE CONDUCTORS (METER TO
 GATEWAY). SYSTEM WILL BE BONDED BY THE NEUTRAL PER
 250.24.
 4] REQUIRED ROOF PATHS HAVE BEEN CORRECTED ON THE PLANS
 (SEE ITEM 3 FROM 3/14/25 REVIEW), HOWEVER, UPON SITE
 VISIT, IT WAS OBSERVED THAT THE ROOF PATH REQUIREMENT
 WAS NOT MET WITH THE INSTALLED ARRAYS. SEE NOTE BELOW
 FOR EXPLANATION.
  
 SITE VISIT 10/23/25 FOR UNRELATED INSPECTION: OBSERVED
 MAJORITY OF SYSTEM ALREADY INSTALLED (CHUCK DORMAN &
 JOHN PAYNE). PERMIT HAS NOT YET BEEN ISSUED AND HAS IN
 FACT EXPIRED. PLANS NOT APPROVED AS OF THIS DATE.
 BUILDING OWNER STATES THAT HE HAS EXECUTED A CONTRACT
 AND HAS MADE PAYMENT TO THIS CONTRACTOR. WORK WITHOUT
 PERMIT VERIFIED. THE INSTALLATION INCLUDES
 MODIFICATIONS OF SOME OF THE EXISTING ELECTRICAL
 SERVICES, CONSTITUTING UNLICENSED ACTIVITY (CONTRACTOR
 OF RECORD HAS CVC LICENSE, NOT ELECTRICAL). PREVIOUS
 REVIEWS HAVE ADVISED THIS CONTRACTOR THAT AN ELECTRICAL
 PERMIT WILL ALSO BE REQUIRED PRIOR TO ISSUING THIS
 PERMIT.
  
 REFERRED TO BUILDING OFFICIAL; TO BE REPORTED TO DBPR
 PENDING ACTION BY HIGHLANDS COUNTY LICENSING
 ENFORCEMENT AND APPEALS BOARD.
  
 NO ADDITIONAL WORK TO BE PERFORMED UNDER THIS PERMIT
 UNTIL PLANS ARE APPROVED, PERMIT IS ISSUED, AND CASE
 DISPOSITION IS COMPLETED.