Plan Review Notes
Plan Review Notes For Permit 24110646
Permit Number 24110646
Review Stop BUILDING
Sequence Number 1
Notes
Date Text
2024-12-06 11:00:15.00000NOC: OR BK 3081 PG 1381 [ON BASE]
  
2024-11-21 13:48:15.000001] SCOPE OF WORK INCLUDES MODIFYING THE ELECTRICAL
 SERVICE EQUIPMENT. AS SUCH, AN ELECTRICAL CONTRACTOR IS
 REQUIRED TO OBTAIN A SEPARATE PERMIT AND TO BE
 RESPONSIBLE FOR THAT PORTION OF THE INSTALLATION FROM
 WITHIN THE METER SOCKET UP TO THE LINE TERMINALS OF THE
 TESLA GATEWAY, AND THE FEEDERS FROM THE TESLA GATEWAY
 TO THE EXISTING ATS. ALTERNATIVELY, A SINGLE SOLAR
 PERMIT MAY BE OBTAINED COVERING THE ENTIRE JOB SCOPE IF
 SUCH PERMIT IS OBTAINED BY AN ELECTRICAL CONTRACTOR
 (APPLICATION LICENSE NUMBER BEGINNING WITH EC, ER, OR
 APPROPRIATE ES).
  
 2] ON SHEET E-1, SHOW CONDUCTOR CALLOUT "H" AS BEING
 COPPER, NOT ALUMINUM
  
 3] ON SHEET L-1, SHOW A LABEL TO BE PLACED AT THE
 SERVICE EQUIPMENT DENOTING THE LOCATION OF THE ENERGY
 STORAGE SYSTEM DISCONNECTING MEANS.
  
 4] ON SHEET L-1, SHOW A LABEL TO BE PLACED ON THE
 GATEWAY DENOTING THE TOTAL COMBINED SYSTEM CURRENT
 OUTPUT AND VOLTAGE (96A/240V). THIS WILL BE IN ADDITION
 TO THE CURRENT/VOLTAGE LABELS PLACED ON EACH INVERTER.
2024-11-20 08:42:20.00000MARILYN.NIEVES@WINDMARHOME.COM/AHJ@WINDMARHOME.COM