-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Notes
Plan Review Notes For Permit 23080184
Permit Number 23080184
Review Stop BUILDING
Sequence Number 1
Notes
Date Text
2023-09-18 08:33:41.00000SENT PAYMENT REQUEST 9/18
2023-08-09 16:19:59.00000SHEET E003: INSTALL #8 BONDING CONDUCTOR BETWEEN LOAD
 SIDE (FEEDER) TAP AND PV DISCONNECT. DO NOT BOND
 NEUTRAL IN PV DISCONNECT. SEE TABLE 250.102 (C)(1) AND
 250.24 (A)(5).
 SUBMIT REVISED E003 OR REVISED SOLAR PLAN SET SHOWING
 CORRECTION.
2023-08-04 09:40:53.00000DANIELA OROZCO
Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved