-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Notes
Plan Review Notes For Permit 22100019
Permit Number 22100019
Review Stop BUILDING
Sequence Number 3
Notes
Date Text
2023-02-09 15:05:46.00000SHEET E-01: PORTIONS OF DRAWING NOT COMPLETELY LEGIBLE.
 OVERCURRENT PROTECTION FOR PV INPUT IN GATEWAY APPEARS
 TO SHOW 100A BREAKER. THIS CIRCUIT BREAKER CAN BE NO
 LARGER THAN 60 AMPS (BASED ON PROTECTED CONDUCTOR
 SIZE). ALSO VERIFY 30A PROTECTION FOR TESLA 5 KW
 POWERWALL.
 SEND NEW SHEET E-01 (WITH CORRECTIONS IF NECESSARY)
 LEGIBLY SHOWING ALL COMPONENTS, CONDUCTOR SIZES, AND
 OVERCURRENT PROTECTION. MAY BE SUBMITTED
 ELECTRONICALLY. IF POSSIBLE, DO NOT SEND ENTIRE SET OF
 PLANS.
2023-02-08 16:52:49.00000DROPPED OFF. ACCIDENTALLY HIT IN ON LAST 2 REVIEW
Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved