2021-10-13 16:02:45.000001] SHEETS E-01 & E-02: #8 CONDUCTORS BETWEEN COMBINER
 PANEL AND INTERCONNECTION POINT ARE UNDERSIZED FOR 125%
 OF COMBINED INVERTER OUTPUTS, AND UNDERSIZED FOR 60 AMP
 OVERCURRENT PROTECTION. (34 IQ7+ INVERTERS @ 1.21 AMPS)
 X 1.25 = 51.4 AMPS. SEE TABLE 310.15 (B)(16): USING 75
 DEGREE COLUMN, # 8 AMPACITY = 50.
 OVERCURRENT PROTECTION FOR #8 (BASED ON 75 DEGREE
 TERMINATIONS) IS LIMITED TO 50 AMPS; 60 AMP IS REQUIRED
 FOR THIS SYSTEM. SEE 240.4 (B). USE #6 THWN CONDUCTORS
 FOR THIS APPLICATION.
 2] PROVIDE SPEC SHEET FOR INVERTERS
 3] PROVIDE SPEC SHEET FOR PV MODULES