Date Text
2021-09-02 11:57:45.000001] SHEETS PV-04 & PV-05: 40 AMP PV BREAKER IN
 SMARTSWITCH IS UNDERSIZED, AND SHOULD BE INCREASED TO
 50 AMP RATING. 31 MICROINVERTERS @ 1.21 AMPS X 1.25 =
 46.88 AMPS.
 2] SHEETS PV-04 & PV-05: CLARIFY IF SERVICE PANEL IS A
 FEED-THROUGH TYPE. IF SO, THE TOTAL RATING OF ALL
 OVERCURRENT DEVICES (EXCLUDING THE MAIN) MUST NOT
 EXCEED THE AMPACITY OF THE BUSBAR. IN SUCH CASE, A
 PERMANENT LABEL SHALL BE ATTACHED PER 705.12
 (B)(2)(C)(3). IF NOT A FEED-THROUGH TYPE PANEL, THE
 PV/POWER STORAGE INPUT CANNOT BE MADE AS A LOAD-SIDE
 TAP BECAUSE THE TOTAL POWER SOURCE INPUTS EXCEED 120%
 OF THE BUSBAR RATING.