-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Notes
Plan Review Notes For Permit 21070076
Permit Number 21070076
Review Stop BUILDING
Sequence Number 1
Notes
Date Text
2021-07-06 14:23:57.00000SHEETS PV-04 & PV-05: CONDUCTORS BETWEEN COMBINER PANEL
 AND PV DISCONNECT MUST HAVE A MINIMUM AMPACITY OF 125%
 OF COMBINED INVERTER OUTPUT (24 X 1.21 X 1.25 = 36.3).
 #10 AMPACITY @ 75 DEGREES C IS 35; EQUIPMENT TERMINAL
 TEMPERATURE RATING 75 DEGREES C. INCREASE CONDUCTOR TO
 #8.
2021-07-06 10:01:06.00000GOSOLAR@LUNEXPOWER.COM
Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved