Date Text
2020-10-20 15:40:40.00000THIS REVISION WAS SUBMITTED AFTER COMPLETION OF
 PROJECT, AND INSPECTION WAS SCHEDULED FOR THE FOLLOWING
 DAY. SEE INSPECTION NOTES.
 PROVIDE AN AS-BUILT DRAWING ADDRESSING THE NOTED
 DEFICIENCIES.
  
 REVISED SHEET PV-3 (ONE LINE DIAGRAM) RECEIVED WITH THE
 FOLLOWING DEFICIENCIES:
 1] TEN-MODULE STRING REQUIRES 15A OVERCURRENT
 PROTECTION PRIOR TO 70A PV DISCONNECT.
 2] SHOW CONDUCTOR SIZE BETWEEN "OLD" SYSTEM AND PV
 DISCONNECT.
 3] CONDUCTORS ON UTILITY SIDE OF PV DISCONNECT MUST
 INCLUDE A MINIMUM #8 CU GROUNDED CONDUCTOR BONDED TO PV
 DISCONNECT ENCLOSURE. REVISE CONDUCTOR & CONDUIT
 SCHEDULE ACCORDINGLY.
 4] VERIFY MICROINVERTER MODEL AND MAXIMUM OUTPUT
 CURRENT (PER UNIT) IS ACCURATE ON BOTH OLD AND NEW
 SYSTEM.
  