-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Notes
Plan Review Notes For Permit 16100415
Permit Number 16100415
Review Stop FIRE
Sequence Number 1
Notes
Date Text
2016-11-29 08:25:57.00000FIRE PLAN REVIEW FEE FOR CORRECTIONS TO BE BLENDED:
 FR$80.00 + FF $30.00=$110.00.
2016-11-17 13:40:26.00000CORRECTIONS TO BE BLENDED- TWO SET OF PLANS SENT TO
 FIRE-CARRIER ERIC LONGSHORE.
2016-11-01 11:07:51.00000JIMMY BRANCA 11/1/2016: I HAVE COMPLETED THE FIRE CODE
 REVIEW OF THESE PLANS WITH THE FOLLOWING FINDINGS:
  
 1. THE PLANS ARE MISSING CIVIL DRAWINGS WHICH WOULD
 DEMONSTRATE FIRE DEPARTMENT ACCESS AND WATER SUPPLY.
 GENERALLY THE CIVIL PLANS COME THROUGH DURING THE
 DEVELOPMENT ORDER PROCESS. DO YOU KNOW IF THIS PROJECT
 HAS AN EXEMPTION FROM A DEVELOPMENT ORDER? IF SO, I
 WILL TRY TO DETERMINE FIRE DEPARTMENT ACCESS AND WATER
 SUPPLY VIA A SITE VISIT.
 2. THE PLANS ARE MISSING A STORAGE PLAN WHICH OUTLINES
 THE TYPE OF STORAGE, STORAGE ARRANGEMENT, ALONG WITH
 COMMODITY STORED. THIS WILL ALSO DETERMINE IF PROPERLY
 SPACED ISLES ARE PROVIDED, AND IF AN AUTOMATIC FIRE
 SPRINKLER SYSTEM IS REQUIRED. THIS PROJECT COULD
 POSSIBLY MEET THE THRESHOLD OF “HIGH PILED COMBUSTIBLE
 STORAGE”. THE ENGINEER OF RECORD STATES ON THE PLANS
 THAT THE BUILDING CODE DOES NOT REQUIRE FIRE
 SPRINKLERS. THIS MAY ALSO BE THE CASE WITH THE FIRE
 CODE; HOWEVER, WITHOUT A STORAGE PLAN I CANNOT MAKE
 THAT DETERMINATION. I HAVE ATTACHED AN INFORMATIVE WORD
 DOCUMENT WHICH OUTLINES SOME OF THE FIRE SPRINKLER
 REQUIREMENTS FOR STORAGE OCCUPANCIES.
 3. THE PLANS ARE MISSING AN ELECTRICAL AND LIGHTING
 PLAN. THEY WILL NEED TO DEMONSTRATE ILLUMINATION OF
 EGRESS ALONG WITH EMERGENCY LIGHTING, AND EXIT SIGNS.
 4. THE LIFE SAFETY PLANS ONLY SHOW ONE EXIT DOOR IN THE
 LARGE SECTION OF THE BUILDING; HOWEVER, THEY INSINUATE
 A SECOND DOOR AT THE REAR WALL (WALL WITHOUT KNEE
 WALL). THIS SECTION WILL NEED TO HAVE A SECOND MEANS OF
 EGRESS AND THE LOCATION WHERE THEY INSINUATE THE EXIT
 DOOR WOULD BE ACCEPTABLE. ALSO, THE EXIT DISCHARGE TO A
 PUBLIC WAY IS NOT SHOWN ON THE PLANS.
  
 13.3.2.27* NEW STORAGE OCCUPANCIES.
 A.13.3.2.27 FOR THE PURPOSE OF THE REQUIREMENTS IN
 13.3.2.27.1 THROUGH 13.3.2.27.3, COMBUSTIBLES INCLUDE
 ALL COMBUSTIBLE MATERIALS IN STORAGE AS WELL AS
 NONCOMBUSTIBLE MATERIALS THAT ARE ENCLOSED,
 ENCAPSULATED, OR PACKAGED IN COMBUSTIBLE MATERIALS.
 13.3.2.27.1 HIGH-PILED STORAGE. AN AUTOMATIC SPRINKLER
 SYSTEM SHALL BE INSTALLED THROUGHOUT ALL OCCUPANCIES
 CONTAINING AREAS GREATER THAN 2500 FT2 (232 M2) FOR THE
 HIGH-PILED STORAGE OF COMBUSTIBLES. 3.3.244.4
 HIGH-PILED STORAGE. SOLID-PILED, PALLETIZED, RACK
 STORAGE, BIN BOX, AND SHELF STORAGE IN EXCESS OF 12 FT
 (3.7 M) IN HEIGHT. [13, 2010]3.3.244.6 LACED TIRE
 STORAGE. TIRES STORED WHERE THE SIDES OF THE TIRES
 OVERLAP, CREATING A WOVEN OR LACED APPEARANCE. [SEE
 FIGURE A.34.8.1(G).] [13, 2010]
Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved