Rev No 3 Status A Date 04-17-2026 Cont ID  
Sent By cdorman Date 04-17-2026 Time 13:26 Rev Time 0.00
Received By cdorman Date 04-17-2026 Time 09:46 Sent To  
Notes
2026-04-22 09:56:07.00000SENT PAYMENT REQUEST
2026-04-17 09:46:47.00000REVISION PERMITTING@MYEQUITYSOLAR.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status D Date 04-15-2026 Cont ID  
Sent By cdorman Date 04-15-2026 Time 14:41 Rev Time 0.00
Received By cdorman Date 04-15-2026 Time 12:43 Sent To  
Notes
2026-04-15 14:40:45.00000SHEET PV-3:
 1] SHOW CONDUCTOR #10 OCPD AS 60A*
 2] SHOW CONDUCTOR #12 OCPD AS 60A*
 3] SHOW CONDUCTOR #12 AS THREE CURRENT-CARRYING
 CONDUCTORS AND REMOVE EQUIPMENT GROUNDING CONDUCTOR.
 FOR SUPPLY-SIDE TAP, NEUTRAL IS BONDED IN PV DISCONNECT
 AND AN EGC SHOULD NOT BE INSTALLED, 250.25.
 4] TRIANGLED NOTE #10, 12, & 13 ARE IN THE WRONG
 LOCATIONS ON THE ONE-LINE DIAGRAM, CORRECT AS
 NECESSARY.
 5] TRIANGLED NOTE #11 IS SHOWN IN TWO INCORRECT
 LOCATIONS ON THE ONE-LINE DIAGRAM, CORRECT AS
 NECESSARY.
 *PLEASE CLARIFY: THE COMBINED INPUT OF PV + ESS WOULD
 REQUIRE A 70A OCPD AND #4 CU UNLESS A PCS FEATURE IS
 INTENDED TO BE USED WITH OR INCORPORATED WITHIN THE IQ
 SYSTEM CONTROLLER. IF SO, THE PCS MUST LIMIT THE OUTPUT
 TOWARD THE MAIN SERVICE TO 48 AMPS. ADJUST PLANS OR
 SPECIFY ACCORDINGLY.
2026-04-15 12:43:58.00000REVISONS PERMITTING@MYEQUITYYSOLAR.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 04-10-2026 Cont ID  
Sent By cdorman Date 04-10-2026 Time 17:05 Rev Time 0.00
Received By cdorman Date 04-10-2026 Time 08:58 Sent To  
Notes
2026-04-10 17:05:11.000001] SHEET PV-3:
 A. CHANGE CONDUCTOR ID #8 TO MINIMUM #6 CU
 B. CHANGE NOTE #11 TO SHOW A LINE SIDE TAP (AS
 INDICATED BY ONE-LINE DRAWING)
 C. REMOVE CALLOUTS FOR NOTES 16 & 17 (NOT APPLICABLE)
  
 2] PROVIDE SPECIFICATION DOCUMENTS FOR ENERGY STORAGE
 COMPONENT.