Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 12-08-2025 Cont ID  
Sent By cdorman Date 12-08-2025 Time 15:50 Rev Time 0.00
Received By cdorman Date 12-03-2025 Time 09:19 Sent To  
Notes
2025-12-11 08:48:20.00000SENT PAYMENT INFO
2025-12-03 09:20:22.00000PERMITTING@MYEQUITYSOLAR.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 11-25-2025 Cont ID  
Sent By cdorman Date 11-25-2025 Time 15:16 Rev Time 0.00
Received By cdorman Date 11-24-2025 Time 13:04 Sent To  
Notes
2025-11-25 15:16:21.00000SHEET PV3:
 1] SHOW CONDUCTOR SIZE (INCLUDING THE PRESENCE OF AN
 EQUIPMENT GROUNDING CONDUCTOR) FOR THE EXISTING FEEDER
 SUPPLYING THE EXISTING 125A LOAD CENTER
 2] CONDUCTOR CALLOUT #4 INDICATES A #10 AWG TERMINATED
 TO A 40A BREAKER (CB5). THIS INFORMATION DOES NOT
 CORRESPOND TO THAT SHOWN IN THE CONDUCTOR TABLE;
 APPEARS TO BE INCORRECT CALLOUT NUMBER, CORRECT AS
 NECESSARY.
 3] SHOW THE INSTALLATION OF A SPD PER 230.67,
 ALTERATION OF SERVICE EQUIPMENT.