Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 10-21-2025 Cont ID  
Sent By cdorman Date 10-21-2025 Time 16:18 Rev Time 0.00
Received By cdorman Date 10-20-2025 Time 13:59 Sent To  
Notes
2025-10-21 16:18:47.00000SHEET PV3:
 1] DISCONNECTING MEANS FOR ENERGY STORAGE MUST BE
 LOCKABLE OPEN, 706.15 (A)(3)
 2] DISCONNECTING MEANS FOR PV SYSTEM (INTERCONNECTION
 TO UTILITY SERVICE) MUST BE LOCKABLE OPEN, 690.13 (E)
 3] SHOW OVERCURRENT PROTECTION FOR ANY LOAD CENTER OR
 OTHER EQUIPMENT SUPPLIED BY FEED-THROUGH CONDUCTORS
 FROM SERVICE PANEL AND SHOW SIZE OF THESE FEEDER
 CONDUCTORS. FEEDERS WILL SEE INPUT FROM BOTH UTILITY
 AND PV; AS SUCH, THEY MUST BE PROTECTED AGAINST
 OVERCURRENT IN ACCORDANCE WITH THEIR AMPACITY. 705.12
 (B)(1).
  
 SHEET PV4: SHOW LABEL INDICATING MAXIMUM DC SYSTEM
 VOLTAGE, 690.53