Plan Review Details - Permit 25100514
Plan Review Stops For Permit 25100514
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 10-30-2025 Cont ID  
Sent By cdorman Date 10-30-2025 Time 07:49 Rev Time 0.00
Received By cdorman Date 10-20-2025 Time 16:03 Sent To  
Notes
2025-10-27 16:04:09.00000REVISION SENT TO CHUCK

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status R Date 10-17-2025 Cont ID  
Sent By cdorman Date 10-17-2025 Time 10:45 Rev Time 0.00
Received By cdorman Date 10-15-2025 Time 16:14 Sent To  
Notes
2025-10-17 10:45:37.00000A. PLEASE PROVIDE SEPARATE SHEET SHOWING ALL REQUIRED
 LABELING. WITH EACH LABEL, TEXTUALLY INDICATE LOCATION
 FOR PLACEMENT. THE FOLLOWING LABELS ARE REQUIRED AT A
 MINIMUM:
  
 1] MAXIMUM SYSTEM DC VOLTAGE, 690.53
 2] RATED TOTAL SYSTEM AC VOLTAGE & CURRENT, 690.54
 3] PV SYSTEM DISCONNECT, 690.13 (B)
 4] RAPID SHUTDOWN DEVICE (FOR THIS GROUND-MOUNT SYSTEM,
 REQUIRED ONLY FOR CONDUCTORS ENTERING THE DWELLING
 UNIT, IF ANY), 690.12, 690.56 (C)(2)
 5] EMERGENCY DISCONNECT/SERVICE DISCONNECT, 230.85
 6] ENERGY STORAGE SYSTEM DISCONNECT, 706.15 (C)
  
 B. NOTE THAT ALL MEANS OF DISCONNECT MUST BE READILY
 ACCESSIBLE AND PERMANENTLY/EFFECTIVELY LABELED. PV AND
 ESS DISCONNECTS SHOULD BE EITHER EXTERNALLY OPERABLE OR
 EASILY ACCESSED WITHOUT THE USE OF TOOLS.
2025-10-15 16:45:13.00000JOE@SOLARTECH.CONTRACTORS

Review Stop FLOODPLAIN FLOODPLAIN/CRITICAL INFRASTRUC
Rev No 1 Status A Date 10-30-2025 Cont ID  
Sent By shullett Date 10-20-2025 Time 16:08 Rev Time 0.00
Received By shullett Date 10-15-2025 Time 16:35 Sent To  
Notes
***NONE***