-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 25090901
Plan Review Stops For Permit 25090901
Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status C Date 10-08-2025 Cont ID  
Sent By hlopez Date 10-08-2025 Time 10:15 Rev Time 0.00
Received By hlopez Date 09-29-2025 Time 14:39 Sent To  
Notes
2025-10-08 10:21:58.00000CALLED TO LET THEM KNOW PERMIT IS READY
2025-10-08 10:16:45.00000PLAN REVIEW PERMIT #: 25090901
 PROJECT: EOC
 LOCATION: 6850 W GEORGE BLVD
 CONTRACTOR:
 OCCUPANCY: BUSINESS
 REVIEWED BY: JASON RAPER, DIVISION CHIEF FIRE MARSHAL
 DATE: 10/8/25
 PLANS WERE REVIEWED UTILIZING THE FLORIDA FIRE
 PREVENTION CODE (FFPC), FLORIDA STATUTE, FLORIDA
 ADMINISTRATIVE RULE, AND ANY REFERENCE NFPA CODE OR
 STANDARD. _____________________________________________
 ___________________________________
 APPROVED - REVIEW FEE – $100 + INSPECTION FEE $50 =
 $150
 G.ANCHORS: CONCRETE THRUST BLOCKS SHALL BE PLACED AT
 ALL BENDS, TEES, PLUGS, AND OTHER FITTINGS TO PROVIDE
 LATERAL SUPPORT. THRUST BLOCKS SHALL CONFORM TO THE
 DETAILS SHOWN ON THE ILLUSTRATIVE STANDARDS. CONCRETE
 SHALL HAVE A COMPRESSIVE STRENGTH OF 2500 PSI AFTER 28
 DAYS, AND SHALL HAVE A MINIMUM CURING TIME OF 3 DAYS.
 THE POURED CONCRETE SHALL BE LEFT EXPOSED FOR A MINIMUM
 OF 24 HOURS BEFORE BACKFILLING AND NOT MORE THAN 48
 HOURS.
 U.FIRE HYDRANT TESTS: PRIOR TO FINAL ACCEPTANCE, ALL
 FIRE HYDRANTS SHALL BE TESTED FOR STATIC, AND RESIDUAL
 PRESSURES, AND FLOW RATE IN GALLONS PER MINUTE (GPM) TO
 DETERMINE THE CAPACITY RATING OF THE HYDRANTS.
 NFPA24:10.4.1 PROTECTION FROM CORROSION.
 NFPA24:10.4.1.1 COATINGS.
 ALL BOLTED JOINT ACCESSORIES SHALL BE CLEANED AND
 THOROUGHLY COATED WITH ASPHALT OR OTHER
 CORROSION-RETARDING MATERIAL AFTER INSTALLATION.
 NFPA24:10.10 TESTING AND ACCEPTANCE.
 NFPA24:10.10.1 APPROVAL OF UNDERGROUND PIPING.
 THE INSTALLING CONTRACTOR SHALL BE RESPONSIBLE FOR THE
 FOLLOWING:
 • (1) NOTIFYING THE AHJ AND THE OWNER'S REPRESENTATIVE
 OF THE TIME AND DATE TESTING IS TO BE PERFORMED
 • (2) PERFORMING ALL REQUIRED ACCEPTANCE TESTS
 • (3) COMPLETING AND SIGNING THE CONTRACTOR'S MATERIAL
 AND TEST CERTIFICATE(S) SHOWN IN FIGURE 10.10.1

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved