Plan Review Details - Permit 25070007
Plan Review Stops For Permit 25070007
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status A Date 09-25-2025 Cont ID  
Sent By cdorman Date 09-25-2025 Time 14:34 Rev Time 0.00
Received By cdorman Date 09-12-2025 Time 13:17 Sent To  
Notes
2025-09-12 13:17:45.00000REVISION

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 07-16-2025 Cont ID  
Sent By cdorman Date 07-16-2025 Time 15:36 Rev Time 0.00
Received By cdorman Date 07-09-2025 Time 15:51 Sent To  
Notes
2025-07-22 10:36:49.00000SENT REQUEST FOR PAYMENT

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status R Date 07-02-2025 Cont ID  
Sent By cdorman Date 07-02-2025 Time 12:57 Rev Time 0.00
Received By trowe Date 07-09-2025 Time 15:50 Sent To  
Notes
2025-07-02 12:57:25.00000SHEET PV3:
 1] PLANS INDICATE PROPOSED METER-MAIN WITH A
 SUPPLY-SIDE TAP; SHOW INTENDED METHOD OF CONNECTION FOR
 THIS TAP. IF USING LOAD-SIDE (FEEDER) TAP, SHOW
 COMPLIANCE WITH 705.12 (B)(1)(B) FOR EXISTING
 FEEDER-SUPPLIED LOAD CENTER AND SHOW COMPLIANCE WITH
 THE LABELING REQUIREMENTS OF 705.12 (B)(3)(3) FOR THE
 PROPOSED METER-MAIN.
 2] SHOW THE INSTALLATION OF AN SPD AT THE NEW SERVICE
 EQUIPMENT PER 230.67.
2025-07-01 10:43:33.00000PERMITTING@MYEQUITYSOLAR.COM