-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 25030801
Plan Review Stops For Permit 25030801
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status X Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By cshackel Date 05-15-2025 Time 14:51 Sent To  
Notes
2025-06-18 13:16:02.00000ACCIDENTLY SENT REVISION TWICE...
2025-05-15 14:51:38.00000REVISION SOLAR@ALLIANCEPERMITTING.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 05-06-2025 Cont ID  
Sent By cdorman Date 05-06-2025 Time 15:41 Rev Time 0.00
Received By cdorman Date 05-02-2025 Time 13:13 Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 04-01-2025 Cont ID  
Sent By cdorman Date 04-01-2025 Time 16:46 Rev Time 0.00
Received By cdorman Date 03-26-2025 Time 12:24 Sent To  
Notes
2025-04-01 16:46:08.00000SHEET PV-3:
 1] SHOW CONDUCTOR SIZE BETWEEN PV DISCONNECT AND
 SUPPLY-SIDE TAP.
 2] CHANGE AC CURRENT LABEL TO SHOW 35A. PER 690.54,
 THIS LABEL SHOULD INDICATE MAXIMUM SYSTEM OUTPUT
 CURRENT WITHOUT THE ADDITION OF DEMAND FACTORS.
2025-03-26 12:27:15.00000SOLAR@ALLIANCEPERMITTING.COM/KATIES@ALLIANCEPERMITTING.
 COM
 NEED: NOC

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved