-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 25030469
Plan Review Stops For Permit 25030469
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status A Date 05-15-2025 Cont ID  
Sent By cdorman Date 05-15-2025 Time 12:08 Rev Time 0.00
Received By cdorman Date 05-08-2025 Time 12:26 Sent To  
Notes
2025-05-08 12:27:34.00000STUBILLAS@TESLA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 04-17-2025 Cont ID  
Sent By cdorman Date 04-17-2025 Time 09:26 Rev Time 0.00
Received By cdorman Date 04-16-2025 Time 15:01 Sent To  
Notes
2025-04-17 09:26:27.00000SHEET 3 (ONE-LINE):
 1] FOR CONDUCTOR CALLOUT 3, CHANGE EGC TO #8CU
 (ASSUMING TERMINATED TO 70A BRKR IN GATEWAY), 250.122.
 2] SHOW INSTALLATION OF SPD AT GATEWAY OR AT EXISTING
 INTERIOR LOAD CENTER, 230.67.
  
 LABEL SHEET:
 1] BASED ON DATA FROM SHEET 3, THE EXISTING SYSTEM
 CONSISTS OF THIRTY-FIVE IQ7+ MICROINVERTERS. IF THIS
 DATA IS ACCURATE, THE EXISTING SYSTEM AC CURRENT OUTPUT
 IS 42.35A (35 X 1.21). THE SUM OF THIS OUTPUT PLUS THE
 TWO PROPOSED POWERWALL 3 (48A EACH) IS 138A. THIS SUM
 VALUE SHOULD BE INDICATED ON THE AC CURRENT LABEL.
 CORRECT AS NECESSARY OR SHOW JUSTIFICATION FOR 152A
 CURRENTLY SHOWN ON THIS LABEL.
 2] SHOW ESS LABEL COMPLYING WITH 706.15 (C) TO BE
 AFFIXED TO EACH POWERWALL 3. THIS LABEL MUST IDENTIFY
 THE ESS DISCONNECTING MEANS AND SHOW NOMINAL AC VOLTAGE
 PLUS MAXIMUM DC VOLTAGE.
2025-04-16 15:02:19.00000REVISION STUBILLAS@TESLA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status D Date 04-01-2025 Cont ID  
Sent By cdorman Date 04-01-2025 Time 15:40 Rev Time 0.00
Received By cdorman Date 03-31-2025 Time 08:49 Sent To  
Notes
2025-04-01 15:40:42.00000LABEL SHEET:
 1] PER ITEM #2 FROM PREVIOUS REVIEW, SHOW LABEL ON
 GATEWAY INDICATING TOTAL SYSTEM MAXIMUM CURRENT OUTPUT.
 WHAT IS THE SUBSTANTIATION FOR 56 AMPS SHOWN ON THIS
 SHEET?
 2] SHOW PCS CURRENT SETTING ON LABEL
  
2025-03-31 08:49:55.00000REVISED PLANS STUBILLA@TESLA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 03-14-2025 Cont ID  
Sent By cdorman Date 03-14-2025 Time 16:47 Rev Time 0.00
Received By cdorman Date 03-14-2025 Time 15:53 Sent To  
Notes
2025-03-18 08:46:08.00000REJECTED NOTES SENT TO CONTRACTOR 3/18
2025-03-14 16:47:18.000001] PROVIDE SPECIFICATION SHEETS ON PROPOSED TESLA
 POWERWALLS.
 2] SHOW LABEL ON NEW GATEWAY INDICATING TOTAL SYSTEM
 CURRENT OUTPUT (EXISTING PV SYSTEM PLUS POWERWALL
 BATTERY OUTPUTS).
 3] SHOW CONDUCTOR SIZE BETWEEN EXISTING PV DISCONNECT
 AND GATEWAY.
 4] SHOW LABEL INDICATING EXACT LOCATION AND MEANS OF
 DISCONNECTING ENERGY STORAGE SYSTEM. THIS DISCONNECTING
 MEANS MUST BE ON THE EXTERIOR OF THE HOUSE, READILY
 ACCESSIBLE, AND PERMANENTLY IDENTIFIED.
2025-03-14 15:53:29.00000STUBILLA@TESLA.COM

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved