Plan Review Details - Permit 25010657
Plan Review Stops For Permit 25010657
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 7 Status A Date 06-25-2025 Cont ID  
Sent By cdorman Date 06-25-2025 Time 16:09 Rev Time 0.00
Received By cdorman Date 06-19-2025 Time 12:34 Sent To  
Notes
2025-06-19 12:34:31.00000REVISION

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 6 Status A Date 05-15-2025 Cont ID  
Sent By cdorman Date 05-15-2025 Time 12:08 Rev Time 0.00
Received By cdorman Date 05-07-2025 Time 11:45 Sent To  
Notes
2025-05-07 11:45:54.00000PERMITSARASOTA@FREEDOMFOREVER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 5 Status D Date 04-24-2025 Cont ID  
Sent By cdorman Date 04-24-2025 Time 13:12 Rev Time 0.00
Received By cdorman Date 04-24-2025 Time 12:04 Sent To  
Notes
2025-04-24 13:12:26.00000NO FEEDER LOAD CALCULATION PROVIDED PER INSTRUCTIONS IN
 PREVIOUS REVIEW. FEEDER PROTECTION UPSIZED FROM 60A TO
 90A.
2025-04-11 08:57:51.00000#5 IS NOT A PLAN REVIEW IT WAS A DUPLICATE OF 4

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status D Date 04-10-2025 Cont ID  
Sent By cdorman Date 04-10-2025 Time 16:55 Rev Time 0.00
Received By cdorman Date 04-10-2025 Time 10:31 Sent To  
Notes
2025-04-10 16:55:28.00000SHEET PV4: PROVIDE AN ARTICLE 220 FEEDER LOAD
 CALCULATION SHOWING THAT BACKED-UP LOADS SUPPLIED FROM
 THE TESLA GATEWAY DO NOT EXCEED 60 AMPS. THESE LOADS
 WILL BE CONNECTED TO THE 60A PROTECTED FEEDER FROM THE
 SERVICE PANEL;
 THIS FEEDER MUST BE CAPABLE OF SUPPLYING THESE LOADS
 WITHOUT THE CONSIDERATION OF SOLAR OR ESS AVAILABILITY.
2025-04-10 10:32:09.00000PERMITSARASOTA@FREEDOMFOREVER.COM CORRET PLANS

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 03-25-2025 Cont ID  
Sent By cdorman Date 03-25-2025 Time 13:42 Rev Time 0.00
Received By cdorman Date 03-25-2025 Time 08:58 Sent To  
Notes
2025-03-25 13:42:29.00000SHEET PV-4:
 1] SHOW CONDUCTOR SIZE SUPPLYING BACKUP LOAD CENTER
 2] GIVEN THE CIRCUIT BREAKER RATINGS TO REMAIN IN THE
 MSP (PER THE PANEL SCHEDULE ON SHEET PV-5B), THE
 INSTALLATION DOES NOT COMPLY WITH 705.12 (B)(3)(3).
 THIS NEC SECTION SPECIFIES THE SUM OF BOTH LOAD AND
 SUPPLY DEVICES EXCLUDING THE MAIN BREAKER SUPPLYING THE
 PANELBOARD.
2025-03-25 08:59:13.00000PERMITSARASOTA@FREEDOMFOREVER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 02-05-2025 Cont ID  
Sent By cdorman Date 02-05-2025 Time 13:56 Rev Time 0.00
Received By cdorman Date 01-29-2025 Time 13:20 Sent To  
Notes
2025-02-18 09:37:55.00000SENT REQUEST FOR PAYMENT
2025-01-29 13:20:47.00000REVISIONS PERMITSSARASOTA@FREEDOMFOREVER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 01-22-2025 Cont ID  
Sent By cdorman Date 01-22-2025 Time 15:24 Rev Time 0.00
Received By cdorman Date 01-17-2025 Time 12:39 Sent To  
Notes
2025-01-22 15:24:35.00000SHEET PV-4:
 1] INDICATE IF EXTERIOR SERVICE EQUIPMENT IS COMPRISED
 OF A METER-MAIN OR OF SEPARATE COMPONENTS
 2] SHOW ALL EXISTING BREAKERS IN EXTERIOR SERVICE PANEL
 WHERE PV INTERCONNECTION IS PERFORMED. CONSIDERING BUS
 RATING AND 125% OF PV INPUT CURRENT, SPECIAL
 LIMITATIONS AND LABELING WILL BE REQUIRED PER 705.12
 (B)(3)(3).
 3] SHOW OVERCURRENT PROTECTION FOR EXISTING INTERIOR
 PANEL. BUS MUST BE PROTECTED AT A VALUE NOT EXCEEDING
 ITS RATING.
2025-01-17 12:40:20.00000PERMITSARASOTA@FREEDOMFOREVER.COM