-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 25010433
Plan Review Stops For Permit 25010433
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 11 Status X Date 04-29-2025 Cont ID  
Sent By cshackel Date 04-29-2025 Time 10:42 Rev Time 0.00
Received By cshackel Date 04-21-2025 Time 08:44 Sent To  
Notes
2025-04-21 08:45:00.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 10 Status C Date 04-10-2025 Cont ID  
Sent By cdorman Date 04-10-2025 Time 08:35 Rev Time 0.00
Received By cdorman Date 04-09-2025 Time 09:07 Sent To  
Notes
2025-04-10 08:34:59.00000CONDITIONAL APPROVAL CONTINGENT ON THE FOLLOWING (NOTED
 ON PLANS):
 1] SHEET PV5, IDENTIFY STRING INVERTER BY MARKING THE
 APPROPRIATE LINE ON THE MANUFACTURER'S LABEL OR BY
 AFFIXING A PERMANENT LABEL TO THE INVERTER IN THE FIELD
 2] SHEET PV7, AFFIX MAXIMUM SYSTEM DC VOLTAGE LABEL TO
 INVERTER PER 690.53
2025-04-09 09:08:19.00000REVISED PERMTTING@SUNWAVEENERGY.BIX

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 9 Status A Date 03-27-2025 Cont ID  
Sent By cdorman Date 03-27-2025 Time 13:41 Rev Time 0.00
Received By cdorman Date 03-20-2025 Time 09:48 Sent To  
Notes
2025-03-20 09:49:24.00000PERMITTING@SUNWAVEENERGY.BIZ REVISED PLANS 3/20 EMAIL

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 8 Status D Date 03-13-2025 Cont ID  
Sent By cdorman Date 03-13-2025 Time 16:31 Rev Time 0.00
Received By cdorman Date 03-13-2025 Time 16:00 Sent To  
Notes
2025-03-13 16:31:44.00000SHEET PV5: INTERCONNECTION CALCULATION AT BOTTOM OF
 SHEET STILL SHOWS THE WRONG INVERTER OUTPUT. SHOW 1.45A
 INVERTER OUTPUT IN THE CALCULATION.
 SHEET PV5 & PV6: SHOW 60A FUSES ON THE ONE-LINE
 DIAGRAMS PER THE PREVIOUS REVIEW COMMENT.
2025-03-13 16:00:49.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 7 Status D Date 03-13-2025 Cont ID  
Sent By cdorman Date 03-13-2025 Time 09:47 Rev Time 0.00
Received By cdorman Date 03-11-2025 Time 08:17 Sent To  
Notes
2025-03-13 09:47:34.00000REVIEW AND CORRECT PLANS FOR CONSISTENCY. THIS IS THE
 7TH REVIEW OF THIS SET OF PLANS. VERIFY ALL CORRECTIONS
 PRIOR TO SUBMISSION.
  
 SHEET PV-5 & PV-6, ASSUMING (29) IQ8-AC MICROINVERTERS
 @ 1.45A EACH, PER PROPOSED SCOPE OF WORK:
 1] INTERCONNECTION CALCULATION AT BOTTOM OF BOTH SHEETS
 SHOWS INCORRECT INVERTER DATA.
 2] INVERTER SPECIFICATION TABLE AT TOP OF BOTH SHEETS
 SHOWS INCORRECT INVERTER OUTPUT WATTAGE.
 3] CHANGE SYSTEM OVERCURRENT PROTECTION TO 60 AMPS (60A
 FUSES).
 4] SHEET PV-5 SHOWS 33 MODULES IN THE ONE-LINE DIAGRAM;
 CHANGE TO 29 MODULES PER PROPOSED SCOPE OF WORK.
  
 SHEET PV-7: CHANGE AC CURRENT OUTPUT LABEL TO SHOW
 42.05A. 29 X 1.45 = 42.05.
  
  
  
2025-03-11 08:17:28.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 6 Status D Date 03-06-2025 Cont ID  
Sent By cdorman Date 03-06-2025 Time 13:49 Rev Time 0.00
Received By cdorman Date 03-06-2025 Time 08:50 Sent To  
Notes
2025-03-06 13:49:08.000001] SHEET PV5: MODULE SPECIFICATION TABLE IN UPPER LEFT
 CORNER OF SHEET DOES NOT CORRESPOND TO SPECIFIED SYSTEM
 MODULES. SHOW VALUES FOR 450W MODULES AS SPECIFIED IN
 COVER SHEET.
 2] SHEET PV7: AC CURRENT LABEL SHOULD SHOW A VALUE OF
 32 AMPS. PER 690.54, THIS VALUE REPRESENTS ACTUAL
 MAXIMUM INVERTER OUTPUT WITHOUT THE APPLICATION OF
 DEMAND FACTORS. THE APPLICATION OF A 125% DEMAND FACTOR
 IS USED FOR SIZING EQUIPMENT, CONDUCTORS, AND
 OVERCURRENT PROTECTION.
2025-03-06 08:50:51.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 5 Status X Date   Cont ID  
Sent By   Date 03-04-2025 Time   Rev Time 0.00
Received By hlopez Date 02-19-2025 Time 15:15 Sent To  
Notes
2025-03-04 08:31:13.00000DUPLICATE PER CHUCK

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status D Date 02-19-2025 Cont ID  
Sent By cdorman Date 02-19-2025 Time 15:00 Rev Time 0.00
Received By cdorman Date 02-19-2025 Time 14:21 Sent To  
Notes
2025-02-19 15:00:42.000001] SHEET PV-5: CONDUCTOR IDENTIFIED BY CALLOUT "D" IS
 OVERSIZED FOR SPECIFIED CONDUIT AND TERMINALS.
 2] SHEET PV-5, TABLE IN UPPER LEFT CORNER: MODULE
 SPECIFICATIONS DO NOT CORRESPOND WITH THOSE OF PROPOSED
 450W MODULES
 3] SHEET PV-7: AC CURRENT LABEL VALUE DOES NOT
 CORRESPOND TO PROPOSED SYSTEM OUTPUT VALUE
2025-02-19 14:21:41.00000PERMITTING@SUNWAVENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status A Date 02-05-2025 Cont ID  
Sent By cdorman Date 02-05-2025 Time 13:56 Rev Time 0.00
Received By cdorman Date 01-27-2025 Time 11:59 Sent To  
Notes
2025-02-05 14:56:30.00000SENT REQUEST FOR PAYMENT
  
2025-01-27 12:00:09.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status D Date 01-22-2025 Cont ID  
Sent By cdorman Date 01-22-2025 Time 14:47 Rev Time 0.00
Received By cdorman Date 01-21-2025 Time 13:02 Sent To  
Notes
2025-01-22 14:47:45.00000ITEMS #2 AND #3 FROM 1/15/25 PLAN REVIEW HAVE NOT BEEN
 CORRECTED.
2025-01-21 13:03:24.00000PERMITTING@SUNWAVEENERGY.BIZ

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 01-15-2025 Cont ID  
Sent By cdorman Date 01-15-2025 Time 15:26 Rev Time 0.00
Received By cdorman Date 01-13-2025 Time 11:43 Sent To  
Notes
2025-01-15 15:26:06.00000PLANS CONTAIN MULTIPLE INCONSISTENCIES; REPLACE OR
 CORRECT AS BELOW.
 1] SHEET PV1 SCOPE OF WORK: OCPD SIZE DOES NOT
 CORRESPOND TO THAT SHOWN IN THE RISER DIAGRAMS ON
 SHEETS PV5 & PV6.
 2] SHEET PV1 SCOPE OF WORK: QUANTITY OF MODULES DOES
 NOT CORRESPOND TO QUANTITY INDICATED IN RISER DIAGRAM
 ON SHEETS PV5 & PV6.
 3] SHEETS PV5 & PV6: IN TOP LEFT CORNER OF SHEETS, THE
 VALUES SHOWN IN THE MODULE AND INVERTER SPECIFICATION
 TABLES DO NOT CORRESPOND TO THOSE SHOWN ON THE
 EQUIPMENT SPECIFICATION SHEETS.
 4] SHEET PV7: UPDATE AC CURRENT LABEL TO REFLECT TOTAL
 MAXIMUM OUTPUT CURRENT OF SYSTEM BASED ON PROPOSED
 MICROINVERTER QUANTITY AND MODEL.
2025-01-13 11:44:02.00000PERMITTING@SUNWAYVEENERGY.BIZ

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved