Plan Review Details - Permit 24110766
Plan Review Stops For Permit 24110766
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 6 Status A Date 11-06-2025 Cont ID  
Sent By cdorman Date 11-06-2025 Time 16:57 Rev Time 0.00
Received By cdorman Date 11-05-2025 Time 12:51 Sent To  
Notes
2025-11-05 12:51:55.00000REVISED PLANS RECEIVED. SOLFLOENERGY@GMAIL.CO,

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 5 Status D Date 10-24-2025 Cont ID  
Sent By cdorman Date 10-24-2025 Time 13:44 Rev Time 0.00
Received By cdorman Date 10-21-2025 Time   Sent To  
Notes
2025-10-24 13:44:49.000001] PROFESSIONAL ENGINEER SEAL IS REQUIRED ON SUBMITTED
 PLANS
 2] SHEETS PV-4, PV4B, PV-4C, PV-4E: IN CONDUCTOR
 SCHEDULE AT TOP OF SHEET, REMOVE THE EQUIPMENT
 GROUNDING CONDUCTOR SHOWN WITH THE SUPPLY-SIDE TAP SET.
 SYSTEM WILL BE BONDED BY THE NEUTRAL PER 250.25 (A).
 3] SHEETS PV-4A, PV-4D, PV-4F: IN CONDUCTOR SCHEDULE AT
 TOP OF SHEET, REMOVE THE EQUIPMENT GROUNDING CONDUCTOR
 SHOWN WITH THE SERVICE-ENTRANCE CONDUCTORS (METER TO
 GATEWAY). SYSTEM WILL BE BONDED BY THE NEUTRAL PER
 250.24.
 4] REQUIRED ROOF PATHS HAVE BEEN CORRECTED ON THE PLANS
 (SEE ITEM 3 FROM 3/14/25 REVIEW), HOWEVER, UPON SITE
 VISIT, IT WAS OBSERVED THAT THE ROOF PATH REQUIREMENT
 WAS NOT MET WITH THE INSTALLED ARRAYS. SEE NOTE BELOW
 FOR EXPLANATION.
  
 SITE VISIT 10/23/25 FOR UNRELATED INSPECTION: OBSERVED
 MAJORITY OF SYSTEM ALREADY INSTALLED (CHUCK DORMAN &
 JOHN PAYNE). PERMIT HAS NOT YET BEEN ISSUED AND HAS IN
 FACT EXPIRED. PLANS NOT APPROVED AS OF THIS DATE.
 BUILDING OWNER STATES THAT HE HAS EXECUTED A CONTRACT
 AND HAS MADE PAYMENT TO THIS CONTRACTOR. WORK WITHOUT
 PERMIT VERIFIED. THE INSTALLATION INCLUDES
 MODIFICATIONS OF SOME OF THE EXISTING ELECTRICAL
 SERVICES, CONSTITUTING UNLICENSED ACTIVITY (CONTRACTOR
 OF RECORD HAS CVC LICENSE, NOT ELECTRICAL). PREVIOUS
 REVIEWS HAVE ADVISED THIS CONTRACTOR THAT AN ELECTRICAL
 PERMIT WILL ALSO BE REQUIRED PRIOR TO ISSUING THIS
 PERMIT.
  
 REFERRED TO BUILDING OFFICIAL; TO BE REPORTED TO DBPR
 PENDING ACTION BY HIGHLANDS COUNTY LICENSING
 ENFORCEMENT AND APPEALS BOARD.
  
 NO ADDITIONAL WORK TO BE PERFORMED UNDER THIS PERMIT
 UNTIL PLANS ARE APPROVED, PERMIT IS ISSUED, AND CASE
 DISPOSITION IS COMPLETED.

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status D Date 03-14-2025 Cont ID  
Sent By cdorman Date 03-14-2025 Time 16:00 Rev Time 0.00
Received By cdorman Date 03-14-2025 Time 10:05 Sent To  
Notes
2025-03-14 16:00:24.00000THE FOLLOWING ITEMS HAVE NOT BEEN ADDRESSED FROM THE
 PREVIOUS REVIEW:
  
 1] SHEETS PV-4, PV-4A, PV-4B, PV-4C, PV-4D, & PV-4F:
 REMOVE EQUIPMENT GROUNDING CONDUCTOR FROM SUPPLY-SIDE
 TAP CONDUCTOR SET. THE SYSTEM WILL BE BONDED TO GROUND
 VIA THE GROUNDED CIRCUIT CONDUCTOR. REFERENCE 250.25
 (A).
  
 2] SHEET PV-4E: PROVIDE MANUFACTURER'S SPECIFICATION
 SHEET FOR 150A PV BREAKER, SHOWING COMPATIBILITY WITH
 EXISTING LOAD CENTER, OR, USE ALTERNATE INTERCONNECTION
 METHOD.
  
 3] BUILDINGS E & G: A MINIMUM 48 INCH-WIDE FIREFIGHTER
 ACCESS PATH MUST EXTEND AROUND THE ENTIRE PERIMETER OF
 THE ROOF (ALL FOUR SIDES). REFERENCE FFPC 11.12.2 FOR
 BUILDINGS OTHER THAN DWELLING UNITS; NO EXCEPTION
 ALLOWED BY HC FIRE MARSHALL.
  
 4] NOTE THAT AN ELECTRICAL PERMIT WILL BE REQUIRED
 (BEFORE THIS PERMIT IS ISSUED) TO COVER ANY SCOPE OF
 WORK THAT INVOLVES MODIFICATION OF THE SERVICE, I.E.,
 THE INSTALLATION OF A GATEWAY AS A NEW SERVICE
 DISCONNECT.
  
2025-03-14 10:06:42.00000RCEVD REVISED SOLAR PLAN, SUPPOSEDLY CORRECT ONE.
 SOLFLOENERGY@GMAIL.CO M

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 03-13-2025 Cont ID  
Sent By cdorman Date 03-13-2025 Time 08:39 Rev Time 0.00
Received By cdorman Date 03-10-2025 Time 07:49 Sent To  
Notes
2025-03-13 08:39:50.00000RECEIVED SAME SET OF PLANS AS PREVIOUS SUBMISSION, NO
 CORRECTIONS.
 IGNORE ITEM #4 IN PREVIOUS REVIEW: 7.6 KW INVERTER
 SPECS ARE INCLUDED.
2025-03-10 07:49:59.00000REVISED PLAN SOLFLOENERGY@GMAIL.COM
  

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status D Date 02-28-2025 Cont ID  
Sent By cdorman Date 02-28-2025 Time 15:43 Rev Time 0.00
Received By cdorman Date 02-25-2025 Time 08:03 Sent To  
Notes
2025-03-04 16:14:46.00000EMAILED 4:14 PM 3/4/25 CAS
2025-02-28 15:43:07.000001] SHEETS PV-4, PV-4A, PV-4B, PV-4C, PV-4D, & PV-4F:
 REMOVE EQUIPMENT GROUNDING CONDUCTOR FROM SUPPLY-SIDE
 TAP CONDUCTOR SET. THE SYSTEM WILL BE BONDED TO GROUND
 VIA THE GROUNDED CIRCUIT CONDUCTOR. REFERENCE 250.25
 (A).
  
 2] SHEET PV-4C: CHANGE CONDUCTORS FOR CALLOUTS 10 & 11
 TO #1 THWN CU; CHANGE FUSES TO 125A (120A IS NOT A
 STANDARD SIZE FUSE); SHOW CONDUCTOR CALLOUTS 3 & 6 IN
 TABLE. REFERENCE 240.6 (A), TBL. 310.16, 75 DEGREE
 TERMINAL RATING.
  
 3] SHEET PV4-E: PROVIDE MANUFACTURER’S SPECIFICATION
 SHEET FOR 150A PV BREAKER, SHOWING COMPATIBILITY WITH
 EXISTING LOAD CENTER.
  
 4] PROVIDE TESLA 7.6 KW INVERTER MANUFACTURER’S
 SPECIFICATION SHEET
  
 5] SHEETS PV-4A, PV-4D, & PV-4F: TESLA POWERWALL 3
 PARAMETER SHOWN ON DIAGRAM DOES NOT CORRESPOND TO
 OUTPUT CURRENT SHOWN IN TABLE AT TOP OF SHEET. SPECIFY
 EXACT MODEL OF POWERWALL ACCORDING TO MAXIMUM AC
 CURRENT OUTPUT.
  
 6] AN ELECTRICAL PERMIT IS REQUIRED TO COVER ANY SCOPE
 OF WORK THAT INVOLVES MODIFICATION OF THE ELECTRICAL
 SERVICE, I.E., THE INSTALLATION OF A GATEWAY BEING USED
 AS A SERVICE DISCONNECT.
  
 7] THE INSTALLATION OF AN SPD IS REQUIRED DURING ANY
 SCOPE OF WORK THAT INVOLVES MODIFICATION OF THE
 ELECTRICAL SERVICE, I.E., THE INSTALLATION OF A GATEWAY
 BEING USED AS A SERVICE DISCONNECT. SHOW THIS
 INFORMATION ON THE AFFECTED SHEETS. REFERENCE 230.67.
  
 8] BUILDINGS G & E: A MINIMUM 48-INCH-WIDE FIREFIGHTER
 ACCESS PATH MUST EXTEND AROUND ENTIRE ROOF PERIMETER.
 REFERENCE FLORIDA FIRE PREVENTION CODE 11.12.2 FOR
 BUILDINGS OTHER THAN DWELLING UNITS; PER HIGHLANDS
 COUNTY
 FIRE MARSHALL, NO EXCEPTIONS OR ALLOWANCES WILL BE
 APPLIED TO THIS REQUIREMENT.
  
  
2025-02-25 08:03:20.00000SOLFLOENERGY@GMAIL.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 02-25-2025 Cont ID  
Sent By cdorman Date 11-25-2024 Time   Rev Time 0.00
Received By cdorman Date 11-22-2024 Time 15:55 Sent To  
Notes
2024-11-25 15:17:35.000001] PV PLANS MUST BE SIGNED AND SEALED BY A FLORIDA
 LICENSED PROFESSIONAL ENGINEER.
 2] THE APPLICANT IS A CVC SOLAR CONTRACTOR. BUILDING F
 INCLUDES MODIFICATIONS TO THE ELECTRICAL SYSTEM; AS
 SUCH, A LICENSED ELECTRICAL CONTRACTOR IS REQUIRED TO
 OBTAIN A PERMIT FOR AT LEAST THIS PORTION OF THE
 PROJECT.
 3] SHEET PV4-E (BUILDING F ONE-LINE DIAGRAM) INDICATES
 A BACKFED PV BREAKER INSTALLED IN A 200A-RATED EXISTING
 MAIN SERVICE PANEL. SHOW ALL OTHER CIRCUIT BREAKERS
 INSTALLED OR TO BE INSTALLED IN THIS PANEL TO VERIFY
 COMPLIANCE WITH 705.12 (B)(3)(3).
 4] BUILDINGS G AND E MUST SHOW A MINIMUM 48" WIDE
 PERIMETER FIRE ACCESS PATH PER THE 8TH EDITION FLORIDA
 FIRE PREVENTION CODE 11.12.3.3.2.1. THIS REQUIREMENT
 WILL BE WAIVED IF THE BUILDINGS ARE NON-HABITABLE
 STRUCTURES.
 5] VALUATION CLAIMED ON THE PERMIT APPLICATION DOES NOT
 APPEAR TO BE CORRECT BASED ON THE SCOPE OF WORK, AND
 WOULD NOT COVER EVEN THE TYPICAL COST OF THE MODULES.
 SHOW CORRECT JOB VALUATION ON PERMIT APPLICATION.
2024-11-22 15:56:54.00000SOLFLOENERGY@GMAIL.COM