Plan Review Stops For Permit 24110707
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 12-04-2024 Cont ID  
Sent By cdorman Date 12-04-2024 Time 13:14 Rev Time 0.00
Received By cdorman Date 12-03-2024 Time 15:51 Sent To  
Notes
2024-12-03 15:52:02.00000REVISION PER PLAN REVIEWER COMMENTS
 PERMITS@SUNLIGHTSOLAR.US

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status R Date 11-21-2024 Cont ID  
Sent By cdorman Date 11-21-2024 Time 15:10 Rev Time 0.00
Received By cdorman Date 11-21-2024 Time 14:25 Sent To  
Notes
2024-11-21 15:10:10.00000LABELS SHOWN ON SHEET E2 INDICATE THAT THE PROPOSED EV
 CHARGER IS BIDIRECTIONAL; I.E., INTENDED TO
 INTERCONNECT WITH THE UTILITY SERVICE AS A PARALLEL
 POWER PRODUCTION SOURCE. PLEASE CLARIFY. IF THIS IS NOT
 THE CASE, DO NOT USE ANY OF THE LABELS SHOWN ON SHEET
 E2.
  
 IF THIS IS INTENDED TO BE A INTERCONNECTED AS A
 PARALLEL POWER PRODUCTION SOURCE, SUBMIT ENTIRE EV
 CHARGER DOCUMENTATION PACKAGE.
2024-11-21 14:26:02.00000PERMITS@SUNLIGHTSOLAR.US