-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 24050456
Plan Review Stops For Permit 24050456
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status A Date 08-28-2024 Cont ID  
Sent By cdorman Date 08-28-2024 Time 15:58 Rev Time 0.00
Received By cdorman Date 08-15-2024 Time 14:28 Sent To  
Notes
2024-09-10 08:35:42.00000SENT PAYMENT REQ FOR REVISED PLANS 09/10
  
2024-09-03 15:52:53.00000SENT PAYMENT REQ
  
2024-08-28 09:55:37.00000PERMITS SARASOTA
 SENT IN REVISION

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status D Date 07-12-2024 Cont ID  
Sent By cdorman Date 07-12-2024 Time 13:12 Rev Time 0.00
Received By cdorman Date 07-10-2024 Time 15:41 Sent To  
Notes
2024-07-12 13:12:00.000001] PROVIDE STATEMENT OF REVISED VALUATION (AMENDED
 APPLICATION OR LETTERHEAD)
 2] SHEET PV4: UTILITY SERVICE TO DWELLING UNIT IS
 REDUCED TO A 100 AMP RATING BY THE CIRCUIT BREAKER IN
 THE PROPOSED TESLA GATEWAY. PROVIDE ACCURATE LOAD
 CALCULATION FOR THIS ELECTRICAL SERVICE TO SUBSTANTIATE
 THIS REDUCTION.
 3] SHEETS PV4 & PV7: FOR COMPLIANCE WITH 706.15, SHOW
 PERMANENT DURABLE LABELING INDICATING THE LOCATION OF
 THE BATTERY DISCONNECTING MEANS (BOTH AT THE GATEWAY
 AND ON THE POWERWALL) OR PROVIDE A SEPARATE SAFETY
 SWITCH OR STOP BUTTON WHICH WILL DISABLE BACKUP POWER.
 IN ALL CASES, THIS DISCONNECTING MEANS MUST BE ON THE
 EXTERIOR OF THE HOUSE AND BE EFFECTIVELY IDENTIFIED.
2024-07-10 15:41:47.00000PERMITS SARASOTA
  

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status A Date 05-22-2024 Cont ID  
Sent By cdorman Date 05-22-2024 Time 14:38 Rev Time 0.00
Received By cdorman Date 05-15-2024 Time 08:36 Sent To  
Notes
2024-05-23 14:27:26.00000SENT PAYMENT REQ
  
2024-05-15 08:37:25.00000PERMITSARASOTA@FREEDOMFOREVER.COM

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved