Plan Review Stops For Permit 24050090
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 05-06-2024 Cont ID  
Sent By cdorman Date 05-06-2024 Time 15:56 Rev Time 0.00
Received By cdorman Date 05-06-2024 Time 14:23 Sent To  
Notes
2024-05-07 09:48:16.00000SEND REQUEST FOR PAYMENT
  
2024-05-06 14:24:05.00000REVISED DRAWING RCVD PERMITS@CORALELECTRIC.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 05-02-2024 Cont ID  
Sent By cdorman Date 05-02-2024 Time 13:35 Rev Time 0.00
Received By cdorman Date 05-02-2024 Time 12:41 Sent To  
Notes
2024-05-02 13:35:19.000001] PROVIDE SPECIFICATION DOCUMENTS FOR PROPOSED EV
 CHARGER UNIT.
 2] SHOW CIRCUIT OVERCURRENT PROTECTION RATING. IF
 ACTUAL MAXIMUM AC LOAD IS 10KW (PER LOAD CALC), THEN
 60A OVERCURRENT PROTECTION MUST BE INCORPORATED
 (625.41) AND THE CHARGER MUST BE PERMANENTLY CONNECTED
 WITHOUT THE USE OF A RECEPTACLE (625.44 C).
 3] SHOW CIRCUIT-TO-CHARGER CONNECTION METHOD ON PLANS.
 A RECEPTACLE CONNECTION MAY BE USED ONLY WITH AN EV
 CHARGER HAVING A MAXIMUM RATING OF 9.6KW (625.44 B &
 C). IF A RECEPTACLE CONNECTION IS USED, THE RECEPTACLE
 MUST BE GFCI PROTECTED (625.54).
 4] REVISE HVAC SECTION OF LOAD CALCULATION. 220.82 (C)
 DOES NOT PERMIT A 65% DEMAND FOR A HEAT PUMP ALONE.
 REFER SPECIFICALLY TO 220.82 (C) (1-3).