-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 24010127
Plan Review Stops For Permit 24010127
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 01-24-2024 Cont ID  
Sent By cdorman Date 01-24-2024 Time 13:34 Rev Time 0.00
Received By cdorman Date 01-09-2024 Time 14:57 Sent To  
Notes
2024-01-24 16:57:58.00000SENT PERMIT PAYMENT REQUEST 1/24
  
2024-01-09 14:57:57.00000REVISION THAT WAS REQUESTED BY PLANS EXAMINER...
 GISELLE@GOSOLARPOWER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 01-04-2024 Cont ID  
Sent By cdorman Date 01-04-2024 Time 16:48 Rev Time 0.00
Received By cdorman Date 01-04-2024 Time 15:13 Sent To  
Notes
2024-01-04 16:48:02.00000SHEET E-1: NEW FEEDER TAP BETWEEN SERVICE AND NEW PANEL
 MUST HAVE AN AMPACITY OF NOT LESS THAN 125 AMPS. THE
 NEW PANEL DOES NOT SUPPLY THE ENTIRE DWELLING UNIT, AND
 THE POTENTIAL LOADS IN THIS NEW PANEL ARE UNKNOWN,
 THEREFORE, 310.12 DOES NOT APPLY (TO ALLOW DERATING).
 USE MINIMUM #1 COPPER WITH 125A OVERCURRENT PROTECTION.
2024-01-04 15:14:26.00000GISELLE@GOSOLARPOWER.COM

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved