Rev No 4 Status A Date 04-18-2024 Cont ID  
Sent By cdorman Date 04-18-2024 Time 13:27 Rev Time 0.00
Received By cdorman Date 04-02-2024 Time 12:25 Sent To  
Notes
2024-04-02 12:26:26.00000REVISION 04/02/2024 JESSICA.FASSNACHT@SUNNOVA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 03-20-2024 Cont ID  
Sent By cdorman Date 03-20-2024 Time 16:42 Rev Time 0.00
Received By cdorman Date 03-20-2024 Time 14:37 Sent To  
Notes
2024-03-20 16:42:47.00000SHEET ESPV-3, ENERGY STORAGE DISCONNECTING MEANS MUST
 BE READILY ACCESSIBLE AND EFFECTIVELY IDENTIFIED AS
 FOLLOWS:
 1] INSTALL PLACARD AT UTILITY SERVICE EQUIPMENT
 (ADJACENT TO METER) INDICATING LOCATIONS OF BATTERY
 DISCONNECTS. (SERVICE EQUIPMENT IS LOCATED AROUND
 CORNER FROM ENERGY STORAGE EQUIPMENT).
 2] INSTALL LABELS ON OR IMMEDIATELY ADJACENT TO
 POWERWALLS OR ON FACE OF GATEWAY INDICATING LOCATION(S)
 OF BATTERY DISCONNECTING MEANS.
  
 ENERGY STORAGE DISCONNECTING MEANS MUST COMPLY WITH NEC
 706.15, AND LABELS MUST BE OF SUFFICIENT DURABILITY TO
 WITHSTAND THE ENVIRONMENT, AND NOT BE HANDWRITTEN.
 FACTORY-INSTALLED SWITCHES ON TESLA POWERWALLS MAY BE
 USED AS DISCONNECTS PROVIDED THEY ARE LOCKABLE IN THE
 OPEN POSITION, ARE PROPERLY IDENTIFIED, AND ARE READILY
 ACCESSIBLE.
 ALTERNATIVELY, A REMOTE LOW VOLTAGE DISABLE SWITCH
 (CONNECTED TO AUX TERMINALS IN THE GATEWAY) MAY BE
 INSTALLED TO ACCOMPLISH ENERGY STORAGE SHUT DOWN AND PV
 RAPID SHUTDOWN.
2024-03-20 14:37:31.00000DAGOBERTO MOLINA SENT IN
 REVISION

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 10-18-2023 Cont ID  
Sent By cdorman Date 10-18-2023 Time 13:51 Rev Time 0.00
Received By cdorman Date   Time   Sent To  
Notes
2023-10-20 16:27:14.00000PROCESSED PAYMENT BUT PLANS HARD COPY HAVEN'T SCANNED
 TO SEND TO CUSTOMER

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status R Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By elthomps Date 08-28-2023 Time 10:37 Sent To  
Notes
2023-09-05 12:42:27.00000CDORMAN DISSAPPROVED THE PLANS.
 SENT ME COMMENTS FOR THE CONTRACTOR. ONBASED 9/5
2023-09-01 15:14:52.00000ORIGINAL PV INSTALLATION UNDER PERMIT #21090249
 SPECIFIES IQ7+ MICROINVERTERS (1.21A OUTPUT).
 ALTERATION PLANS FOR ADDING ENERGY STORAGE SPECIFY
 EXISTING IQ7-60 MICROINVERTERS (1.0A OUTPUT).
 VERIFY ACTUAL EXISTING MICROINVERTERS AND MODIFY SHEET
 ESPV-3 AS NECESSARY TO REFLECT EXISTING INSTALLATION.
 THIS VARIABLE WILL AFFECT CONDUCTOR AND OVERCURRENT
 SIZES ON THE PROPOSED INSTALLATION AND MUST BE
 ACCURATELY SHOWN ON NEW PLANS.
2023-08-28 10:37:37.00000MAILED IN BY SUNNOVA