Plan Review Details - Permit 22100019
Plan Review Stops For Permit 22100019
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 8 Status A Date 06-02-2023 Cont ID  
Sent By cdorman Date 06-02-2023 Time 15:06 Rev Time 0.00
Received By cdorman Date 06-02-2023 Time 12:35 Sent To  
Notes
2023-06-02 12:36:36.00000REVISION EMAILED IN BY SUNVENA PERMITS
 

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 7 Status A Date 05-10-2023 Cont ID  
Sent By cdorman Date 05-10-2023 Time 14:44 Rev Time 0.00
Received By cdorman Date 05-10-2023 Time 08:29 Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 6 Status D Date 04-25-2023 Cont ID  
Sent By cdorman Date 04-25-2023 Time 15:56 Rev Time 0.00
Received By cdorman Date 04-24-2023 Time 09:14 Sent To  
Notes
2023-04-25 15:56:38.00000SHEET E-01: #10 AWG CONDUCTORS BETWEEN MAIN SERVICE
 PANEL AND TESLA SWITCH ARE UNDERSIZED FOR INDICATED
 OVERCURRENT PROTECTION AND DO NOT INCLUDE AN EQUIPMENT
 GROUNDING CONDUCTOR.
 PLEASE REVIEW ONE-LINE DIAGRAM CAREFULLY PRIOR TO
 SUBMITTING NEXT REVISION.
2023-04-24 09:14:44.00000RESPONSE TO REVISION REQUEST PERMITS@SUNVENA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 5 Status D Date 04-18-2023 Cont ID  
Sent By cdorman Date 04-18-2023 Time 15:47 Rev Time 0.00
Received By cdorman Date 04-18-2023 Time 14:23 Sent To  
Notes
2023-04-18 15:47:29.00000SHEET E-01:
 1] ADD A #6 CU EQUIPMENT GROUNDING CONDUCTOR WITH THE
 FEEDER CONDUCTOR SET BETWEEN THE MAIN SERVICE PANEL AND
 THE TESLA GATEWAY.
 2] THE #2 CU CONDUCTOR BETWEEN THE TESLA GATEWAY AND
 THE INTERIOR SUB PANEL IS UNDERSIZED FOR THE 150A
 OVERCURRENT PROTECTION. CHANGE CONDUCTOR SIZE OR SHOW
 APPROPRIATE OVERCURRENT PROTECTION.
2023-04-18 14:24:24.00000REVISED PLANS PERMITS@SUNVENA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status A Date 02-17-2023 Cont ID  
Sent By cdorman Date 02-17-2023 Time 15:26 Rev Time 0.00
Received By cdorman Date 02-17-2023 Time 13:29 Sent To  
Notes
2023-02-17 13:30:42.00000REPLIES TO REQUEST FROM CHARLES FOR MORE INFO
 PERMITS@SUNVENA.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status R Date 02-09-2023 Cont ID  
Sent By cdorman Date 02-09-2023 Time 15:05 Rev Time 0.00
Received By cdorman Date 02-08-2023 Time 16:51 Sent To  
Notes
2023-02-09 15:05:46.00000SHEET E-01: PORTIONS OF DRAWING NOT COMPLETELY LEGIBLE.
 OVERCURRENT PROTECTION FOR PV INPUT IN GATEWAY APPEARS
 TO SHOW 100A BREAKER. THIS CIRCUIT BREAKER CAN BE NO
 LARGER THAN 60 AMPS (BASED ON PROTECTED CONDUCTOR
 SIZE). ALSO VERIFY 30A PROTECTION FOR TESLA 5 KW
 POWERWALL.
 SEND NEW SHEET E-01 (WITH CORRECTIONS IF NECESSARY)
 LEGIBLY SHOWING ALL COMPONENTS, CONDUCTOR SIZES, AND
 OVERCURRENT PROTECTION. MAY BE SUBMITTED
 ELECTRONICALLY. IF POSSIBLE, DO NOT SEND ENTIRE SET OF
 PLANS.
2023-02-08 16:52:49.00000DROPPED OFF. ACCIDENTALLY HIT IN ON LAST 2 REVIEW

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 12-06-2022 Cont ID  
Sent By cdorman Date 12-06-2022 Time 14:27 Rev Time 0.00
Received By slozada Date 12-06-2023 Time 16:49 Sent To  
Notes
2022-12-02 09:39:13.00000DROPPED OFF

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status A Date 10-25-2022 Cont ID  
Sent By cdorman Date 10-25-2022 Time 15:57 Rev Time 0.00
Received By cdorman Date 10-04-2022 Time 15:57 Sent To  
Notes
***NONE***