Plan Review Details - Permit 22040226
Plan Review Stops For Permit 22040226
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status A Date 12-14-2022 Cont ID  
Sent By cdorman Date 12-14-2022 Time 15:06 Rev Time 0.00
Received By cdorman Date 11-23-2022 Time 12:18 Sent To  
Notes
2022-11-23 12:19:17.00000FL PERMITS

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 08-25-2022 Cont ID  
Sent By cdorman Date 08-25-2022 Time 16:18 Rev Time 0.00
Received By hherring Date 11-23-2022 Time 12:18 Sent To  
Notes
2022-08-25 16:18:55.000001] PROVIDE SPECIFICATION SHEET FOR PROPOSED SE6000H
 INVERTER
 2] SHEET E-1: REMOVE "TRENCH" REFERENCE AND SECOND PV
 DISCONNECT (APPLICABLE TO PREVIOUS INSTALLATION BEFORE
 THIS REVISION)
 3] SHEET E-4: AC CURRENT LABEL TO SHOW ACTUAL MAXIMUM
 INVERTER OUTPUT OF 25 AMPS WITHOUT THE ADDITION OF ANY
 CONTINUOUS DEMAND FACTORS
  
2022-08-25 09:00:35.00000REVISED PLANS FLPERMITS@VISIONSOLAR.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 07-18-2022 Cont ID  
Sent By cdorman Date 07-18-2022 Time 08:22 Rev Time 0.00
Received By cdorman Date 06-29-2022 Time 13:41 Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 04-07-2022 Cont ID  
Sent By cdorman Date 04-07-2022 Time 15:58 Rev Time 0.00
Received By cdorman Date 04-07-2022 Time 11:16 Sent To  
Notes
2022-04-07 15:57:54.000001] CLARIFICATION REQUIRED ON SHEET E1. CONDUIT #3 FROM
 MAIN HOUSE ARRAY TO COMBINER CONTAINS TWO #10
 CURRENT-CARRYING CONDUCTORS TERMINATING INTO A 2-POLE
 20A BREAKER. ARE ALL 16 MICROINVERTERS INTENDED TO
 SUPPLY A SINGLE STRING? IF SO, 125% OF THE COMBINED
 INVERTER OUTPUT EXCEEDS THE RATING OF THE 20A BREAKER.
 NOTES INSIDE THE COMBINER INDICATE "TWO" 20A BREAKERS
 FOR THIS APPLICATION. PLEASE CLEARLY INDICATE THE
 INTENDED STRING CIRCUITRY AND OVERCURRENT PROTECTION.
  
 2] SHOW A GROUNDING ELECTRODE SYSTEM COMPLYING WITH
 PART III OF ARTICLE 250 AT THE SHED PV DISCONNECT.
 STRUCTURES SUPPORTING A PV ARRAY MUST HAVE A GROUNDING
 ELECTRODE SYSTEM; SEE 690.47.
2022-04-07 11:16:52.00000FLPERMITS@VISIONSOLAR.COM