Plan Review Details - Permit 22020035
Plan Review Stops For Permit 22020035
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 5 Status X Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By hherring Date 11-22-2022 Time 08:18 Sent To  
Notes
2022-11-22 08:19:10.00000SENT IN A REVISION ON 11/08/2022 FROM
 SADHA@GOSOLARPOWER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 4 Status A Date 11-21-2022 Cont ID  
Sent By cdorman Date 11-21-2022 Time   Rev Time 0.00
Received By cdorman Date 11-18-2022 Time 14:29 Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status D Date 10-27-2022 Cont ID  
Sent By cdorman Date 10-27-2022 Time 15:41 Rev Time 0.00
Received By cdorman Date 10-27-2022 Time 15:29 Sent To  
Notes
2022-10-27 15:40:57.00000REFER TO SHEET E-1 FOR THE FOLLOWING COMMENTS:
 1] SHOW TRANSFORMER GROUNDING ELECTRODE CONNECTION TO
 EXISTING (OR REPLACED) BUILDING SERVICE GROUNDING
 ELECTRODE. SHOW GROUNDING ELECTRODE CONDUCTOR SIZE
 BETWEEN TRANSFORMER AND BUILDING ELECTRODE. 250.30
 (A)(4), TABLE 250.66.
 2] TRANSFORMER SECONDARY PROTECTION MUST NOT EXCEED
 250% OF RATED SECONDARY OUTPUT. FOR THIS PURPOSE, THE
 SECONDARY IS IDENTIFIED AS CONNECTING TO THE UTILITY
 WITH 240 VOLTS 3-PHASE. TABLE 450.3 (B).
 3] SHOW PERMANENT LABEL ON TRANSFORMER INDICATING THE
 LOCATION OF THE PRIMARY DISCONNECTING MEANS, OR INSTALL
 UNFUSED PRIMARY DISCONNECT WITHIN SIGHT OF TRANSFORMER.
 FOR THIS PURPOSE, THE PRIMARY IS IDENTIFIED AS
 CONNECTING TO THE INVERTER. 450.14.
 4] IT IS RECOGNIZED FROM PREVIOUS INSPECTIONS THAT
 CONDUCTOR ID #6 IN THE TRENCH DOES NOT INCLUDE AN
 EQUIPMENT GROUNDING CONDUCTOR AS SHOWN ON THE PLANS.
 THIS SET OF CONDUCTORS CONSISTS OF ONLY FOUR INSULATED
 WIRES; AS SUCH, IT IS NOT POSSIBLE TO
 PROVIDE BOTH A NEUTRAL AND AN EQUIPMENT GROUND BETWEEN
 THE INVERTER AND THE TRANSFORMER. AN EQUIPMENT GROUND
 IS MANDATORY; VERIFY MANUFACTURER REQUIREMENT FOR
 INVERTER OPERATION WITHOUT A NEUTRAL CONDUCTOR.

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 04-06-2022 Cont ID  
Sent By cdorman Date 04-06-2022 Time 12:34 Rev Time 0.00
Received By cdorman Date 03-22-2022 Time 12:48 Sent To  
Notes
2022-03-22 12:48:28.00000JACKSON@GOSOLARPOWER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status A Date 02-10-2022 Cont ID  
Sent By cdorman Date 02-10-2022 Time 15:15 Rev Time 0.00
Received By cdorman Date 02-01-2022 Time 14:57 Sent To  
Notes
2022-02-01 14:57:36.00000SUBMITTED ELECT ALSO JACKSON@GOSOLARPOWER.COM