Plan Review Stops For Permit 21100472
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 12-14-2021 Cont ID  
Sent By cdorman Date 12-14-2021 Time 14:26 Rev Time 0.00
Received By cdorman Date 12-08-2021 Time 14:46 Sent To  
Notes
2021-12-08 14:47:00.00000REVISION JAIMIE@LUNEXPOWER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 10-18-2021 Cont ID  
Sent By cdorman Date 10-18-2021 Time 15:06 Rev Time 0.00
Received By cdorman Date 10-15-2021 Time 11:35 Sent To  
Notes
2021-10-18 15:06:24.00000SHEET PV-6:
 1] #6 CONDUCTOR NOT APPROVED BETWEEN COMBINER PANEL AND
 INTERCONNECTION. CONDUCTOR MUST HAVE A MINIMUM AMPACITY
 OF 68.06 AT 75 DEGREES C (PER STANDARD TERMINAL
 TEMPERATURE RATING). USE #4 CONDUCTORS PER ENGINEERING
 SCHEDULE ON SHEET PV-7.
 2] CLARIFY "LOAD TAP CONNECTION" SHOWN. HOW WILL THIS
 TERMINATION BE ACCOMPLISHED ON THE LOAD SIDE OF THE
 SERVICE DISCONNECT BREAKER?
  
2021-10-15 11:35:53.00000JAIMIE@LUNEXPOWER.COM