-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 21030594
Plan Review Stops For Permit 21030594
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status A Date 05-18-2021 Cont ID  
Sent By cdorman Date 05-18-2021 Time 15:06 Rev Time 0.00
Received By cdorman Date   Time   Sent To  
Notes
2021-05-18 12:32:12.00000SENT IN REVISED PLANS CHANGED LAYOUT OF THE PANELS
 NBOROJERDI@TITANSOLARPOWER.COM

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status R Date 04-07-2021 Cont ID  
Sent By cdorman Date 04-07-2021 Time 16:31 Rev Time 0.00
Received By cdorman Date 04-07-2021 Time   Sent To  
Notes
2021-04-07 16:31:22.000001] PROVIDE SPECIFICATION SHEET(S) FOR TESLA GATEWAY
 2] ONE-LINE DIAGRAM IS UNCLEAR: #2 CONDUCTORS TO 40A
 BACKFED PV BREAKER? 200A SUBPANEL RATED FOR 125A?
 OVERCURRENT PROTECTION FOR EXISTING SUBPANEL?
 3] #8 CU EQUIPMENT GROUNDING CONDUCTOR POSSIBLY TOO
 SMALL TO BE USED WITH #2 CU UNGROUNDED CONDUCTORS; WILL
 BE DETERMINED BY CIRCUIT OVERCURRENT PROTECTION.

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status A Date 03-22-2021 Cont ID  
Sent By cdorman Date 03-22-2021 Time 08:24 Rev Time 0.00
Received By cdorman Date 03-16-2021 Time 16:29 Sent To  
Notes
2021-03-16 16:29:51.00000NBOROJERDI@TITANSOLARPOWER.COM EMAILED

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved