Plan Review Stops For Permit 21020819
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 03-05-2021 Cont ID  
Sent By cdorman Date 03-05-2021 Time 14:49 Rev Time 0.00
Received By cdorman Date 03-05-2021 Time 14:49 Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 02-26-2021 Cont ID  
Sent By cdorman Date 02-26-2021 Time 08:04 Rev Time 0.00
Received By cdorman Date 02-25-2021 Time 10:12 Sent To  
Notes
2021-02-26 08:04:41.000001] SHEET E-01: OPTIONAL PV DISCONNECT IS RATED 60 AMPS.
 IF USED, MUST BE RATED AT LEAST 125% OF TOTAL COMBINED
 INVERTER OUTPUT.
 2] SHEET E-01: PV DISCONNECT CONNECTING SUPPLY SIDE TAP
 TO SYSTEM IS DRAWN AS A LOADCENTER WITH A 100 AMP BUSS
 AND AN 80 AMP MAIN BREAKER. AS SUCH, 125% OF INVERTER
 OUTPUT PLUS MAIN BREAKER RATING EXCEED 120% OF BUSS
 RATING. CHANGE THIS EQUIPMENT TO A 2-POLE PV DISCONNECT
 WITH 80 AMP OVERCURRENT PROTECTION. MUST BE LOCATED
 WITHIN TEN FEET OF SUPPLY-SIDE TAP.
 3] SHEET E-03: ADD LABEL FOR RAPID SHUTDOWN SWITCH TO
 BE APPLIED TO OR WITHIN 3 FEET OF PV DISCONNECT. THIS
 IS IN ADDITION TO THE RAPID SHUTDOWN
 INFORMATION/COMPLIANCE LABEL.
2021-02-25 10:13:10.00000OFFICE@PROESOLAR.COM