-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 20010139
Plan Review Stops For Permit 20010139
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 3 Status A Date 05-04-2020 Cont ID  
Sent By mcarner Date 05-04-2020 Time 15:51 Rev Time 0.00
Received By mcarner Date 04-27-2020 Time 08:44 Sent To  
Notes
2020-04-27 14:09:14.00000REVISED PLANS SHOWING SERVICE CHANGE FOR PV SYSTEM
 INTERCONNECTION. SERVICE CHANGE PERMIT WILL BE PULLED
 SEPARATELY BY EC.
2020-04-27 08:44:28.00000REVISED PLANS RECEIVED FOR THIS JOB.

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 01-29-2020 Cont ID  
Sent By cdorman Date 01-29-2020 Time 16:08 Rev Time 0.00
Received By cdorman Date   Time   Sent To  
Notes
***NONE***

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 01-08-2020 Cont ID HC04105-01
Sent By cdorman Date 01-29-2020 Time 16:08 Rev Time 0.00
Received By cdorman Date 01-08-2020 Time 08:16 Sent To  
Notes
2020-01-28 10:35:29.00000RECEIVED REVISED PLANS IN MAIL 01/28/2020.
2020-01-08 14:55:50.00000SHEET S-3: A 60 AMP BACKFED CIRCUIT BREAKER IS
 INDICATED TO CONNECT THE INVERTER OUTPUT CIRCUIT TO A
 200 AMP PANEL. AS DRAWN, THIS PRESENTS TWO COMPLIANCE
 ISSUES:
  
 1] INSTALL A MINIMUM #10 EGC FROM THE PANEL TO THE PV
 DISCONNECT SWITCH AND REMOVE THE NEUTRAL/GROUND BOND IN
 THE PV DISCONNECT SWITCH. AS DRAWN, THERE IS A
 VIOLATION OF 250.24 (A) (5).
 2] THE 60 AMP BACKFED BREAKER EXCEEDS THE SIZE ALLOWED
 BY 705.12 (D)(2)(3) UNLESS THE PANEL INCORPORATES AT
 LEAST A 225 AMP BUSS AND NO MORE THAN A 200 AMP MAIN
 BREAKER. IF THIS IS THE CASE, INDICATE CLEARLY ON THE
 DRAWING. ONE OF THE OPTIONS LISTED IN 705.12 (D)(2)(3),
 AS APPLICABLE, MUST BE USED WITH A BUSSBAR TERMINATION.
  
 AS AN ALTERNATIVE TO ITEMS 1 & 2 ABOVE, TERMINATE THE
 INVERTER OUTPUT CONDUCTORS USING A SUPPLY-SIDE TAP.

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved