Plan Review Details - Permit 19100214
Plan Review Stops For Permit 19100214
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 2 Status A Date 12-06-2019 Cont ID  
Sent By cshackel Date 12-06-2019 Time 08:23 Rev Time 0.00
Received By C DORMAN Date 12-06-2019 Time 08:23 Sent To  
Notes
2019-12-06 08:24:27.00000CALLED TO LET KNOW PERMIT IS READY, PHONE JUST RINGS
 AND RINGS 12/06/2019

Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status D Date 10-10-2019 Cont ID  
Sent By cdorman Date 10-10-2019 Time 16:27 Rev Time 0.00
Received By cdorman Date 10-09-2019 Time 10:51 Sent To  
Notes
2019-10-10 16:27:11.000001] 3/4" RACEWAYS FROM COMBINER BOX TO SERVICE ARE TOO
 SMALL FOR INDICATED CONDUCTOR SIZES UNLESS CONDUITS ARE
 24" OR LESS IN LENGTH.
 2] 100 AMP FUSE IS TOO LARGE FOR #4 THWN CONDUCTORS;
 USE MAXIMUM 90A FUSE. AMPACITY OF #4 THWN @ 75 DEGREES
 CELSIUS IS 85.
 3] SHOW INSTALLATION OF RAPID SHUTDOWN COMPLIANCE LABEL
 AT PV DISCONNECT LOCATION.