-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Plan Review Details - Permit 19060114
Plan Review Stops For Permit 19060114
Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status A Date   Cont ID  
Sent By   Date 06-18-2019 Time   Rev Time 0.00
Received By   Date 06-08-2019 Time   Sent To  
Notes
2019-06-19 08:33:30.00000JIMMY EMAILED THE APPROVAL AND IS DROPPING PLANS OFF

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status R Date   Cont ID  
Sent By   Date 06-07-2019 Time   Rev Time 0.00
Received By hlopez Date 06-05-2019 Time 16:51 Sent To  
Notes
2019-06-07 16:25:16.00000MEMORANDUM
  
 TO: ERIC LONGSHORE, BUILDING OFFICIAL
  
 FROM: JAMES E. BRANCA, SR., BATTALION CHIEF, FIRE
 MARSHAL
  
 DATE: JUNE 7, 2019
  
 RE: LAKE BONNET DRY HYDRANT, PERMIT 19060114
  
  
  
 I HAVE REVIEWED THESE PLANS FOR CONFORMANCE WITH THE
 NFPA 1142, STANDARD ON WATER SUPPLIES FOR
 SUBURBAN AND RURAL FIRE FIGHTING, 2012 EDITION, WITH
 THE FOLLOWING ISSUES NEEDING TO BE ADDRESSED:
  
 1. CALCULATIONS DEMONSTRATING THE DESIGN WILL PROVIDE A
 MINIMUM FLOW OF 1000 GPM AT DRAFT.
 2. ADDITIONAL DETAILS ON THE STRAINER DESIGN. STRAINERS
 CAN BE LOCALLY FABRICATED BY DRILLING
 SUFFICIENT 3/8 INCH HOLES IN A LENGTH OF PIPE TO EQUAL
 4 TIMES THE CROSS-SECTIONAL AREA OF THE
 PIPE AND CAPPING THE END WITH A REMOVABLE OR HINGED
 COVER.
 3. THERE IS LESS THAN THE MINIMUM OF 1’ OF WATER BELOW
 THE STRAINER.
 4. EXPOSED PIPING AND FITTING SURFACES NEED PRIMED AND
 PAINTED TO PREVENT DETERIORATION.
 5. PROVIDE A SIGN WITH REFLECTIVE LETTERING USING
 MINIMUM 3” LETTERS WITH A ½ INCH STROKE STATING:
 DRY FIRE HYDRANT FIRE DEPARTMENT USE ONLY.
 6. THRUST BLOCK AT THE HORIZONTAL TO VERTICAL RISER.
 7. CONCRETE PAD SUPPORTING FOR THE BASE AT THE FIRE
 DEPARTMENT CONNECTION.
 8. INSPECTION AND MAINTENANCE PROGRAM CONSISTING OF THE
 FOLLOWING:
  
 INSPECTION AND MAINTENANCE OF DRY HYDRANTS
 • DRY HYDRANTS SHALL BE INSPECTED AT LEAST QUARTERLY
 AND MAINTAINED AS NECESSARY TO KEEP THEM IN
 GOOD OPERATING CONDITION.
 • ALL ROADS LEADING TO THE DRY HYDRANT WILL HAVE AND
 MAINTAIN AN OVERHEAD CLEARANCE OF 13’ 6’
 FOR FIRE DEPARTMENT ACCESS.
 • THOROUGH SURVEYS SHALL BE CONDUCTED, TO REVEAL ANY
 DETERIORATION IN THE WATER SUPPLY SITUATION
 IN THE LAKE.
 • GRASS, BRUSH, AND OTHER VEGETATION SHALL BE KEPT
 TRIMMED AND NEAT. VEGETATION SHALL BE CLEARED
 FOR A MINIMUM 3 FT. RADIUS FROM AROUND HYDRANTS.
 • THE HYDRANTS SHALL BE PAINTED, AS NEEDED, WITH
 REFLECTIVE MATERIAL TO ENHANCE THEIR VISIBILITY
 DURING EMERGENCIES.
 • THE HYDRANTS SHALL BE FLOW TESTED AT LEAST ANNUALLY
 WITH A FIRE DEPARTMENT PUMP TO ENSURE THE
 MINIMUM DESIGN FLOW IS MAINTAINED.
  
  
 PLEASE HAVE THE APPLICANT ADDRESS THESE ISSUES.
  
2019-06-05 16:52:25.00000WILL NEED TO ADD CONTRACTOR TO PERMIT INFORMATION
 SCREEN AND FIND OUT THE COST OF THE WORK/VALUATION

Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved