Plan Review Stops For Permit 16100415
Review Stop BUILDING BUILDING DEPARTMENT
Rev No 1 Status A Date 11-29-2016 Cont ID  
Sent By nsulliva Date 11-29-2016 Time 14:35 Rev Time 0.00
Received By ELONGSHO Date 10-27-2016 Time 14:35 Sent To  
Notes
2016-11-17 13:38:34.00000CORRECTIONS TO BE BLENDED-THREE (3) SET OF PLANS
 SUBMITTED.
2016-11-07 16:03:48.00000EMAIL: PER OUR DISCUSSION WE WILL REVISED THE COVER
 SHEET INCLUDE NFPA 1 SECTION
 13.3.2.27 NEW STORAGE OCCUPANCIES.
 THE BUILDING IS NOT A HIGH PILE STORAGE FACILITY BY
 DEFINITION 3.3.244.4 & SEC 13.3.2.27.1 HIGH PILE
 STORAGE FOR REFERENCING
 THE 12FT MAXIMUM FOR RECYCLABLE STORAGE.
 2
 WE WILL REVISE AND RESUBMIT THE COVER SHEET TO INCLUDE
 THE FOLLOWING CODE INFO:
 NFPA 1
 SECTION 13.3.2.27 NEW STORAGE OCCUPANCIES
 SEC 13.3.2.27.2 GENERAL STORAGE (NOT HIGH PILE
 THE PROJECT WILL HAVE A SAFETY YELLOW PAINTED LINE AT
 12 FEET ABOVE FINISH FLOOR TO INDICATE THE MAXIMUM
 STORAGE HEIGHT
 FOR ORDINARY STORAGE.
 THE OWNER SHALL MAINTAIN THE RECYCLABLES PILED STORAGE
 AT OR BELOW 12 FEET AT ALL TIMES.
 1‐ARE EMPLOYEES WALKING WITHIN/THRU THE TRASH
 PILES – THE RTF BUILDING WILL BE USED AS A TRANSFER
 STATION FOR CURBSIDE
 COLLECTED (SINGLE STREAM I.E.,, ALL IN ONE CONTAINER)
 RECYCLABLES THAT WILL INCLUDE: ALUMINUM CANS, STEEL
 CANS, PLASTIC
 CONTAINERS (HDPE AND PE), CARDBOARD, MIXED PAPER.
 EMPLOYEES DO NOT WALK THE BUILDING WHEN RECYCLABLES ARE
 DUMPED,
 ONLY THE FRONT LOADER ENTERS THE BUILDING. EMPLOYEES DO
 CLEAN THE FACILITY WHEN EMPTY.
 2‐HOW HIGH DO THE RECYCLABLE PILES GET – 15 FT OR
 LESS (MAX)
 3‐WHAT TYPE OF RECYCLABLE IS DUMPED – ALUMINUM
 CANS, STEEL CANS, PLASTIC CONTAINERS (HDPE AND PE),
 CARDBOARD, MIXED
 PAPER, NO “TRASH”
 4‐WHERE ARE THE RECYCLABLES SORTED, IN THIS
 BUILDING OR AT ANOTHER BUILDING – WE WILL JUST TRANSFER
 THE MATERIAL WITHIN THIS
 FACILITY/CAMPUS. THE ROUTE TRUCKS WILL OFFLOAD IN
 BUILDING AND WE WILL HAVE A FRONT END LOADER THAT WILL
 PUSH UP THE
 MATERIAL AND LOAD THE TRUCKS.
 5‐HOW OFTEN DO THE RECYCLABLES CYCLE THRU,
 TURNOVER RATE – I BELIEVE BASED THE INITIAL
 ASSUMPTIONS, WE WILL HAVE A 100 CYD
 TRANSFER TRUCK LOADED EACH DAY. TO KEEP THE MATERIAL
 STOCKPILE DOWN WE WOULD ADD TRANSFER TRUCKS TO GET THE
 MATERIAL
 OUT FASTER.
 6‐IS THE RECYCLABLES IN THE TIPPING BUILDING LONG
 ENOUGH FOR HEAT TO BUILD UP – BASED ON THE ORIGINAL
 ASSUMPTIONS, THE
 MATERIAL SHOULD NOT BE IN THE BUILDING LONG. WE WILL
 TRY AND KEEP THE TRANSFER TRUCKS SCHEDULED TO GET
 MATERIAL OUT DAILY.
 I ALSO ATTACHED 3 PICTURES SHOWING A VERY SIMILAR
 BUILDING AND HOW IT LOOKS.
 PLEASE NOTE THAT OUR EMAIL ADDRESSES ARE CHANGING. MY
 NEW EMAIL IS JOE@JVBARCHITECT.COM.
 OUR OLD EMAIL ADDRESSES WILL STILL RECEIVE EMAIL FOR
 THE NEXT COUPLE OF MONTHS.
 SINCERELY,
 JOSEPH V. BELLUCCIA, PRINCIPAL
 AIA NCARB LEED®AP
 1719 N HOWARD, AVE, SUITE 201
 TAMPA, FL 33607
 LICENSED IN: AL, AZ, FL, GA, IL, IN, KY, LA, MD, MI,
 NC, NJ, NM, NY, OK, PA, SC, TX, VA
 JVB ARCHITECT, LLC
 P: 813.258.3233, EXT 202
 F: 813.258.3236
 AA26001002
 JOSEPH BELLUCCIA, AIA IS AFFILIATED WITH JVB ARCHITECT,
 LLC, A FLORIDA COMPANY. INFORMATION CONTAINED IN THIS
 E-MAIL (INCLUDING PLANS, SKETCHES, PDF ATTACHMENTS,
 ETC.) MAY BE PRIVILEGED AND CONFIDENTIAL. IF THE READER
 OF THIS MESSAGE IS NOT THE INTENDED RECIPIENT, OR
 RESPONSIBLE AGENT, YOU ARE HEREBY NOTIFIED THAT ANY
 DISSEMINATION, DISTRIBUTION OR COPYING OF THIS
 COMMUNICATION IS STRICTLY PROHIBITED. IF YOU HAVE
 RECEIVED THIS COMMUNICATION IN ERROR, PLEASE NOTIFY US
 IMMEDIATELY BY
 REPLYING TO THE MESSAGE AND DELETING IT FROM YOUR
 COMPUTER. THANK YOU. JVB ARCHITECT, LLC.
 FROM: BRANCA,
2016-11-01 15:59:45.00000ERIC'S COMMENTS: I HAVE REVIEWED THE PLANS FOR THE
 RECYCLING TRANSFER BUILDING, PERMIT #16100415, AND HAVE
 THE FOLLOWING
 QUESTIONS AND COMMENTS:
 1. THE PLANS DO NOT SHOW ELECTRIC SERVICE FOR THIS
 STRUCTURE. THE LARGE PORTION OF THE STRUCTURE IS
 SHOWN AS OPEN ALONG ELEVATION 3. (THIS IS IN QUESTION,
 SEE COMMENT #2} WITH THIS OPEN AREA
 DAYTIME OPERATION WOULD BE FEASIBLE WITHOUT ADDITIONAL
 ILLUMINATION BUT EXIT LIGHTING WOULD STILL
 BE REQUIRED . IF OTHER THAT DAYTIME OPERATION IS USED
 EMERGENCY LIGHTING OF EGRESS PASSAGE WILL
 ALSO BE REQUIRED . THE SMALLER 19'X 25' ENCLOSED AREA
 WILL NEED EXIT AND EMERGENCY LIGHTING
 REGARDLESS AS NATURAL LIGHT WILL NOT PROVIDE REQUIRED
 ILLUMINATION LEVEL.
 2. ELEVATION 3 SHOWS AS OPEN WITH 14'X16' OVERHEAD
 DOOR. I PRESUME THAT THIS DOOR IS "BEYOND"
 ALTHOUGH NOT INDICATED AS SUCH, AND WOULD BE THE DOOR
 AT OTHER SIDE OF STRUCTURE. THE CIVIL SITE
 PLANS SHOW AN OVERHEAD DOOR AT THIS LOCATION. PLEASE
 CLARIFY IF THERE IS AN OVERHEAD DOOR ON THIS
 SIDE OF THE STRUCTURE AND IF THERE IS, SHOW WHAT
 STRUCTURAL MEMBERS WILL BE ADDED FOR MOUNTING
 THIS DOOR.
 3. THERE IS NO DESIGNATION OF THE LENGTH OF THE HEADED
 STUDS ON THE STEEL PLATES ON THE PUSH WALL
 SECTION, ONLY THE DIAMETER. PLEASE ADD LENGTH FOR THESE
 STUDS.

Review Stop ENGINEER SITE & DRAINAGE FDO
Rev No 1 Status A Date   Cont ID  
Sent By   Date 12-06-2016 Time   Rev Time 0.00
Received By hlopez Date 10-27-2016 Time 13:21 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status A Date 11-28-2016 Cont ID  
Sent By nsulliva Date 11-23-2016 Time 15:43 Rev Time 0.00
Received By J BRANCA Date 10-27-2016 Time 15:43 Sent To  
Notes
2016-11-29 08:25:57.00000FIRE PLAN REVIEW FEE FOR CORRECTIONS TO BE BLENDED:
 FR$80.00 + FF $30.00=$110.00.
2016-11-17 13:40:26.00000CORRECTIONS TO BE BLENDED- TWO SET OF PLANS SENT TO
 FIRE-CARRIER ERIC LONGSHORE.
2016-11-01 11:07:51.00000JIMMY BRANCA 11/1/2016: I HAVE COMPLETED THE FIRE CODE
 REVIEW OF THESE PLANS WITH THE FOLLOWING FINDINGS:
  
 1. THE PLANS ARE MISSING CIVIL DRAWINGS WHICH WOULD
 DEMONSTRATE FIRE DEPARTMENT ACCESS AND WATER SUPPLY.
 GENERALLY THE CIVIL PLANS COME THROUGH DURING THE
 DEVELOPMENT ORDER PROCESS. DO YOU KNOW IF THIS PROJECT
 HAS AN EXEMPTION FROM A DEVELOPMENT ORDER? IF SO, I
 WILL TRY TO DETERMINE FIRE DEPARTMENT ACCESS AND WATER
 SUPPLY VIA A SITE VISIT.
 2. THE PLANS ARE MISSING A STORAGE PLAN WHICH OUTLINES
 THE TYPE OF STORAGE, STORAGE ARRANGEMENT, ALONG WITH
 COMMODITY STORED. THIS WILL ALSO DETERMINE IF PROPERLY
 SPACED ISLES ARE PROVIDED, AND IF AN AUTOMATIC FIRE
 SPRINKLER SYSTEM IS REQUIRED. THIS PROJECT COULD
 POSSIBLY MEET THE THRESHOLD OF “HIGH PILED COMBUSTIBLE
 STORAGE”. THE ENGINEER OF RECORD STATES ON THE PLANS
 THAT THE BUILDING CODE DOES NOT REQUIRE FIRE
 SPRINKLERS. THIS MAY ALSO BE THE CASE WITH THE FIRE
 CODE; HOWEVER, WITHOUT A STORAGE PLAN I CANNOT MAKE
 THAT DETERMINATION. I HAVE ATTACHED AN INFORMATIVE WORD
 DOCUMENT WHICH OUTLINES SOME OF THE FIRE SPRINKLER
 REQUIREMENTS FOR STORAGE OCCUPANCIES.
 3. THE PLANS ARE MISSING AN ELECTRICAL AND LIGHTING
 PLAN. THEY WILL NEED TO DEMONSTRATE ILLUMINATION OF
 EGRESS ALONG WITH EMERGENCY LIGHTING, AND EXIT SIGNS.
 4. THE LIFE SAFETY PLANS ONLY SHOW ONE EXIT DOOR IN THE
 LARGE SECTION OF THE BUILDING; HOWEVER, THEY INSINUATE
 A SECOND DOOR AT THE REAR WALL (WALL WITHOUT KNEE
 WALL). THIS SECTION WILL NEED TO HAVE A SECOND MEANS OF
 EGRESS AND THE LOCATION WHERE THEY INSINUATE THE EXIT
 DOOR WOULD BE ACCEPTABLE. ALSO, THE EXIT DISCHARGE TO A
 PUBLIC WAY IS NOT SHOWN ON THE PLANS.
  
 13.3.2.27* NEW STORAGE OCCUPANCIES.
 A.13.3.2.27 FOR THE PURPOSE OF THE REQUIREMENTS IN
 13.3.2.27.1 THROUGH 13.3.2.27.3, COMBUSTIBLES INCLUDE
 ALL COMBUSTIBLE MATERIALS IN STORAGE AS WELL AS
 NONCOMBUSTIBLE MATERIALS THAT ARE ENCLOSED,
 ENCAPSULATED, OR PACKAGED IN COMBUSTIBLE MATERIALS.
 13.3.2.27.1 HIGH-PILED STORAGE. AN AUTOMATIC SPRINKLER
 SYSTEM SHALL BE INSTALLED THROUGHOUT ALL OCCUPANCIES
 CONTAINING AREAS GREATER THAN 2500 FT2 (232 M2) FOR THE
 HIGH-PILED STORAGE OF COMBUSTIBLES. 3.3.244.4
 HIGH-PILED STORAGE. SOLID-PILED, PALLETIZED, RACK
 STORAGE, BIN BOX, AND SHELF STORAGE IN EXCESS OF 12 FT
 (3.7 M) IN HEIGHT. [13, 2010]3.3.244.6 LACED TIRE
 STORAGE. TIRES STORED WHERE THE SIDES OF THE TIRES
 OVERLAP, CREATING A WOVEN OR LACED APPEARANCE. [SEE
 FIGURE A.34.8.1(G).] [13, 2010]