-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Code Enforcement Detail
Code Enforcement Detail
Case Number CE23040025 complainant JEANETTE MARRIAM
Case Date 04-05-2023 address 6502 E LANE
Origination VISIT - IN PERSON VISIT Status C - CLOSED
Operator droarty Officer WEST
Fines Balance $0.00
Lien Balance $0.00
Total Balance $0.00
Property On Case
STRAP NBR C-24-35-28-070-0050-0430 Owner MCPHERSON DAVID W + KIMBERLY D
Unit   Owner Address 6309 E LANE
Property Address 6309 E LN City/State/Zip SEBRING FL 33875
City/State/Zip SEBRING FL 33875- Phone  
Case Description
COMPLAINANT STATED PROPERTY OWNER HAS HEAVY
EQUIPMENT ON HIS PROPERTY ON IS ADVERTISING HIS
BUSINESS (HEARTLAND CRANE-LLC). DR
Complaint Code(s)
1: COMMERCIAL VEHICLE PARKING
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
06-04-202411:01 AMCLOSE COMPLAINTCASE CLOSED BY JDAMMANN
06-04-202411:01 AMREINSPECTIONPERMIT C/O 12.18.2023, PERMIT 23110550
COMPLY/CLOSE CASE. PURSUANT TO ZONING
CONVERSATION W/ RB MONTHS AGO, ONCE BLDG
WAS COMPLETED, TO STORE THE COMMERICAL
EQUIPMENT IN, THE CASE WOULD BE
COMPLIED. JD 45 MIN
12-04-202312:14 PMREINSPECTION12-4-2023 PULLED PERMIT FOR BLDG AND
SLAB 23110550, MOVING OUT 6 MONTH TO
ACCOMODATE CONSTRUCTION. JD
10-09-202301:11 PMUPDATE/NOTES10-9-2023 SPOKE WITH DAVID, HE STATED HE
CHANGED ENGINEERS, NOW WITH MASON AT
COOL AND COBB, ASKED HIM TO HAVE THEM
SEND ME SOMETHING IN WRITING THAT THEY
ARE WORKING ON THE ENGINEERED DRAWINGS
HE WOUL DHAVE THEM EMAIL ME. JD 30 MIN
09-22-202302:40 PMREINSPECTIONSENT EMAIL TO OWNER, TO INQUIRE OF
STATUS OF THE BARN. ALLOWING 2 MORE
WEEKS. JD 45 MIN
06-29-202304:32 PMUPDATE/NOTESEMAIL RECIEVED, BARN ENGINEERING STATED
THAT IT WOULD BE ANOTHER WEEK OR TWO
BEOFRE THE DRAWINGS WILL BE BACK
(ENGINEERED DRAWINGS), ALLOWING FOR TIME
TO OBTAIN THESE. JD 15 MIN
06-15-202305:50 PMUPDATE/NOTES6-15-2023 DAVID STATED THAT THE LOADER
NEEDED A PART HE WAS PICKING IT UP THIS
EVENING AND WORK SHOULD START THIS
WEEKEND ON CLEAN UP. GREG GRIFFIN IS THE
CONTRACTOR FOR THE BLDG. RICHARD CYBER
IS THE ENGINEER, ONCE DRAWINGS ARE
COMPLETE, BLDG. PERMIT WILL BE PULLED.
HE STATED ONCE PULLED THE BLDG WILL
START CONSTRUCTION, TWO WALLS AND ROOF
WILL BE INSTALLED FIRST, THE TWO ROLL UP
DOORS ON EITHER END, THEY ARE HAVING AN
ISSUE WITH THE MATERIALS FOR THE DOORS,
A LONG LEAD TIME, AS THE SUPPLIERS ARE
BACKED UP. HE IS FORAWRDING EMAILS FROM
CONTRACTOR TO CE JD FOR ADDED
CONFIRMATION OF COMPLIANCE AND ONCE THE
BLDG IS COMPLETE IT WILL HOUSE ALL OF
THE CRANES (ENCLOSED STRUCTURE). JD 30
MIN
06-15-202302:32 PMREINSPECTION6-15-2023 LOADER FOR TREE REMOVAL
ONSITE, AS DISCUSSED, CONNEX THERE FOR
CONSTRUCTION OF METAL BLDG. DID NOT
OBSERVE COMM. EQUIPMENT ON THIS DAY.
ALLOWING TIME TO COMPLY WITH BLDG PERMIT
JD / DR 1 HOUR
05-18-202311:03 AMUPDATE/NOTES5-18 OWNER CALLED AND STATED THAT HE WAS
GOING TO HAVE THE TREE DEBRIS REMOVED
THIS WEEKEND, AND THAT THE METAL BLDG.
SHOULD BE HERE IN TWO WEEKS. WILL WORK
WITH HIM ON TIME TO COMPLY AFTER THE 6-4
DATE. KEEPING CE UPDATED AND IS MOVING
FORWARD WITH COMPLIANCE. JD 45 MIN
05-05-202312:11 PMUPDATE/NOTES5-5-2023 RETURNED CALL TO DAVID AGAIN,
INFORMED HIM THAT CE REVIEWED CASE WITH
ZONING SUPER RB AND SAID IF HE CAN STORE
THE EQUIPMENT INTO THE LARGE METAL BLDG
WHEN NOT IN USE, HE COULD KEEP THE
CRANES ONSITE. CE ASKED HIM TO PLEASE
START ON THE REMOVAL OF THE TREE DEBRIS
FROM THE REAR AS WELL AS THE DERELICT
BOATS, HE SAID THE BURN BAN WAS KEEPING
HIM FROM BURNING, INFORMED HIM THAT HE
COULD TAKE THE LANDFILL. INFORMED HIM OF
THE HORT. LANDFILL OFF OF 17 TO CHECK
INTO THAT, AS THEY MAY NOT CHARGE FOR
TREE DBRIS. HE SAID HE WOULD START ON
THIS NEXT WEEK. AS LONG AS CE CAN SEE
FORWARD PROGRESS, WE CAN WORK WITH HIM
ON THE 8 WEEK LEAD TIME FOR THE METAL
BLDG. HE THANKED CE FOR THE CALL. JD 30
MIN
05-05-202309:39 AMUPDATE/NOTES5-5-2023 SPOEK WITH DAVID, 863-253-2030,
HE EXPLAINED HIS PLANS ON INSTALLING A
LARGE SHED/SHOP TO STORE THE EQUIPMENT
IN. HE ALSO SPOKE WITH ZONING RB AND SHE
SAID THAT SHOULD BE OK. WILL REVIEW WITH
STAFF A LITTLE MORE WITH CONCERNS FROM
CODE. JD 30 MIN
05-05-202308:13 AMUPDATE/NOTES5-5-23 OWNER DAVID CALLED, 863-253-2030,
HE WAS SURPRISED HE'S NOT ABLE TO PARK
HIS EQUIPMENT THERE. HE JUST OBTAINED
PERMIT TO PUT IN DRIVEWAY AND IMPROVED
ROAD. TRANSFERRED HIM TO ZONING TO SEE
IF ZONING CHANGE WOULD WORK FOR HIM, BSS
05-04-202302:57 PMINITIAL INSPECTION5-4-2023 POSTED WC23040025A TO DAVID W
AND KIMBERLY D MCPHERSON FOR 5.6-3,
5-17, 12.08.109, 12.10.217 AND GAVE
UNTIL 6-3-23 TO COMPLY BY REMOVING
DERELICT BOATS, LARGE PILES OF TREE
DEBRIS AT REAR AND DISCONTINUE RUNNING
CRANE BIZ FROM RESIDENTIAL ZONING AND
REMOVE COMMERCIAL EQUIPMENT FROM
RESIDENTIAL ZONING. 5-5-2023 MAIL
CERT/REG MAIL 5-11 POST TO CE BOARD.
JD/DR 1 HOUR
04-05-202304:08 PMCREATE COMPLAINTCOMPLAINT RECORDED BY DROARTY
Copyright © 2008 – THE PLUS SERIES ® – All Rights Reserved