-     My Account  
   

Log in is not required to search. In the red banner above select: I Want To > Search > Permits

Code Enforcement Detail
Code Enforcement Detail
Case Number CE17010155 complainant  
Case Date   address  
Origination PHONE - TELEPHONE CALL RECEIVED Status C - CLOSED
Operator elongsho Officer ERIC
Fines Balance $0.00
Lien Balance $0.00
Total Balance $0.00
Property On Case
STRAP NBR C-26-34-28-020-0000-8790 Owner DAAK DOUG + BONNIE
Unit   Owner Address 211 KITE AVE
Property Address 211 KITE AVE City/State/Zip SEBRING FL 33870
City/State/Zip SEBRING FL 33872 Phone  
Case Description
CONSTRUCTION WITHOUT PERMIT, CONTRACTOR NOT
LICENSED AND WORK TAKING LONG TIME. DRAWS TAKEN
AND WORK NOT COMPLETED.
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
05-01-201712:16 PMCLOSE COMPLAINTCASE CLOSED BY ELONGSHO
05-01-201712:15 PMUPDATE/NOTESPERMIT #17040345 HAS BEEN OBTAINED FOR
THIS PROJECT BY NEW CONTRACTOR. CASE
WILL GO BEFORE THE BOARD ON MAY 2, 2017.
CLOSE CASE.
04-17-201711:05 AMREINSPECTIONNATHAN KOOGLER CAME INTO OFFICE TO
DISCUSS THIS CASE. EXPLAINED THAT THIS
COMPLAINT WAS SCHEDULED TO GO BEFORE THE
BOARD AND THAT THE BOARD WOULD MOST
LIKELY RESCIND THEIR SPONSORSHIP FOR MR.
KOOGLER TO TAKE THE EXAM. MR. KOOGLER
WAS APPROVED TO TAKE THE ALUMINUM
SPECIALTY EXAM IN DECEMBER OF 2015 BUT
MR. KOOGLER HAS NOT TAKEN OR PASSED THE
EXAM FOR LICENSURE. I RECOMMENDED THAT
MR. KOOGLER FIND EMPLOYMENT WITH AN
ESTABLISHED FIRM TO LEARN MORE ABOUT THE
BUSINESS ASPECTS OF CONSTRUCTION AND
POSSIBLY TO TAKE SOME BUSINESS CLASSES
AT THE COLLEGE TO PREPARE HIM TO RUN A
BUSINESS. HE SAID HE APPRECIATED THE
ADVISE AND WOULD LOOK INTO BETTER
PREPARING HIMSELF IN BUSINESS.
03-07-201711:05 AMREINSPECTIONNEW CONTRACTOR CAME INTO OFFICE TO
INQUIRE WHAT NEEDED TO BE DONE TO
COMPLETE THIS PROJECT. APPARENTLY MS.
DAAK HAS FOUND SOMEONE TO COMPLETE JOB.
I INFORMED THAT PLANS WOULD NEED TO BE
SUBMITTED AND A PERMIT OBTAINED.
CONTRACTOR SAID HE WOULD START WORKING
ON HAVING PLANS DRAWN.
02-09-201711:02 AMREINSPECTIONI HAQVE MADE ATTEMPTS TO CONTACT NATHAN
KOOGLER AND A WORKER NAMED CHRIS TO NO
AVAIL. VOICE MAIL MESSAGE STATES THAT
NATHAN HAS HAD A MEDICAL EMERGENCY AND
WILL BE UNAVAILABLE. FOLLOW UP CONTACT
WITH MS. DAAK STATES THAT SHE IS UNABLE
TO COMPLETE PROJECT SO I INFORMED THAT I
WOULD KEEP FOLLOWING UP WITH MR. KOOGLER
TO COMPLETE PROJECT.
01-26-201705:23 PMINITIAL INSPECTIONRECEIVED CALL FROM NEIGHBOR ON BEHALF OF
OWNER. MADE SITE VISIT AND SPOKE WITH
OWNER ABOUT CONCERNS. THERE IS A ROOM
ADDITION BEING CONSTRUCTED ON THE REAR
OF THE HOME. NEW CONCRETE SLAB HAS BEEN
POURED, ALUMINUM FRAME WALLS HAVE BEEN
ERECTED, A STRUCTURAL ALUMINIM ROOF
SYSTEM HAS BEEN INSTALLED, WINDOWS AND
EXTERIOR DOOR ARE IN PLACE AND ELECTRIC
WIRING IS IN PROGRESS OF BEING
INSTALLED. VINYL SIDING IS NEAR
COMPLETION ON THE EXTERIOR OF ADDITION.
OWNER STATES THAT ADVANCED ALUMINUM WAS
CONTRACTED WITH IN JULY OF 2016. SHE
PRODUCED A PROPOSAL/SCOPE OF WORK DATED
JULY 8, 2016 WITH JOB COSTS AS
$15,702.19. SHE ALSO PRODUCED A DOCUMENT
DATED NOVENBER 30, 2016 SHOWING COSTS TO
DATE AND DOCUMENTING A DEPOSIT OF
$7,851.19 ON JULY 8, 2016 AND A DRAW OF
$2,000.00 ON NOVENBER 22, 2016. A CHANGE
ORDER WAS NOTED FOR TILE OF $450.00.
THEN NOTED AS "NEEDED" ROOF, SURVEY,
PERMIT & FEE AND HEALTH WITH $2,275.06
BESIDE IT. HAND WRITTEN IN WAS TOTAL JOB
WITH TILE $16,152.19, PAID TO DATE
$9,851.19 AND $6,301.00 AS OWED. A DRAW
OF $2,500.00 ON NOVEMBER 30, 2016.
BALANCE OF $3,801, A DRAW OF $2,000.00
ON DECEMBER 9 OR 19, 2016 LEAVING
BALANCE OF $1,800.00. A SECOND DOCUMENT
SHOWING PREVIOUS JOB COSTS THROUGH
11/30/2016 AND ADDITIONAL JOB COSTS
THROUGH 12/9/2016 OF $3,247.80, COMBINED
EXPENSES TO DATE OF $9,173.89. JOB TOTAL
WITH CHANGE ORDER: $16,152.19, DEPOSIT
OF $7,819.00 ON 7/8/16, $2,000.00 DRAW
ON 11/22/16, $2,500.00 DRAW ON 11/30/16
AND BALANCE OF $3,800.00. HAND WRITTEN
IN IS A DRAW OF $2,000.00 ON 12/9/16 AND
BALANCE OF $1,800.00 WITH SIGNATURE OF
NATE S. K-ILLEGIBLE. THIS SECOND
DOCUMENT IS NOT DATED AND ALSO HAS A
STARED NOTE STATING "THIS DOES NOT
INCLUDE MY LABOR OR UPCOMING CHANGE
ORDERS". WHAT THIS NOTE IS ALLUDING TO
IS UNDETERMINED AT THIS TIME. ADVANCED
ALUMINUM IS NOT REGISTERED IN THIS
JURISDICTION AND NATHAN KOOGLER IS NOT
REGISTERED AS A CONTRACTOR OF ANY KIND
IN THE COUNTY. FROM INSPECTION, WORK HAS
PROGRESSED VERY SLOWLY AND IS AT POINT
THAT REMAINING BALANCE WILL NOT COVER
WORK TO BE PERFORMED. THE THREE DRAWS
RECEIVED ON 11/22/2016, 11/30/2016, AND
12/9/2016 TOTALING $6,500.00 SHOULD HAVE
FACILITATED COMPLETION OF THE PROJECT
BUT WORK HAS STOPPED OR SLOWED
SIGNIFICANTLY. MR. KOOGLER SHOULD HAVE
FUNDS AVAILABLE TO COMPLETE PROJECT WITH
REMAINING BALANCE A MINIMAL PROFIT.
PLANS AND A PERMIT WILL HAVE TO BE
OBTAINED FOR THIS PROJECT. INSPECTIONS
OTHER THAN THE SLAB INSPECTION COULD BE
CAUGHT UP TO DATE. I SHARED WITH MRS.
DAAK THAT I WOULD CONTACT MR. KOOGLER
CONCERNING HER PROJECT AND BE BACK IN
TOUCH.
01-26-201704:14 PMCREATE COMPLAINTCOMPLAINT RECORDED BY ELONGSHO