Code Enforcement Detail
Code Enforcement Detail
Case Number CE15110105 complainant  
Case Date 11-19-2015 address  
Origination PHONE - TELEPHONE CALL RECEIVED Status O - OPEN (UNVERIFIED)
Operator elongsho Officer OFFICE
Fines Balance $0.00
Lien Balance $0.00
Total Balance $0.00
Property On Case
STRAP NBR C-10-36-29-010-00G0-0050 Owner BREZINA JERRY D
Unit   Owner Address 250 HILLSIDE DR
Property Address 250 HILLSIDE DR City/State/Zip LAKE PLACID FL 33852
City/State/Zip LAKE PLACID FL 33852 Phone  
Case Description
BUILDING DEPARTMENT COMPLAINT
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
12-07-201508:26 PMREINSPECTION 
11-30-201511:36 AMUPDATE/NOTESSPOKE BY PHONE WITH DON COCHRAN. HE
WANTED TO SPEAK WITH COUNTY ATTORNEY
ROSS MACBETH CONCERNING THIS JOB. I
TOLD HIM THAT I HAD ALREADY SPOKEN WITH
ROSS SO HE SAID HE WOULD CALL ROSS AND
GET BACK WITH ME. DON AND RON COCHRAN
CALLED ME BACK AND SPOKE ON SPEAKER
PHONE. THEY INDICATED THAT THEY HAD
DETERMINED, AFTER SPEAKING WITH ROSS,
THAT THE ROOF WAS OUT OF WARRANTY AND
THAT THEY WOULD NOT DO REPAIR WORK.
THEY RECOUNTED THE ISSUES THAT THEY HAVE
HAD WITH THIS OWNER IN THE PAST AND
DECIDED THAT THEY WOULD RATHER NOT HAVE
TO DEAL WITH HIM AGAIN. I THEN WENT TO
SEE MR. BREZINA AND TOLD HIM OF COCHRAN
ROOFINGS DECISION. HE QUESTIONED THE 5
YEAR WORKMANSHIP WARRANTY. I TOLD HIM
THAT I DID NOT HAVE THE CONTRACT AND
THAT ALL I HAD TO GO ON WAS COCHRANS
CLAIM THAT THIS IS WHAT THEIR CONTRACT
STIPULATED. HE INDICATED THAT HE
BELIEVED THAT WE HAD THE CONTRACT ON
FILE AND WANTED ME TO PULL THE FILE AND
INVESTIGATE THE CONTRACT. I TOLD HIM
THAT WE DO NOT NORMALLY KEEP CONTRACTS
ON FILE AS THEY ARE NOT PART OF THE
PERMITTING PROCESS. HE THEN SAID HE
WOULD FIND HIS ORIGINAL CONTRACT TO
CHECK IT HIMSELF. HE THEN QUESTIONED ME
AS TO WHAT I WAS GOING TO DO TO ASSIST
HIM WITH THIS PROBLEM. I TOLD HIM THAT
IT WAS GOING TO BE A CIVIL MATTER FOR
THE COURT SYSTEM TO RESOLVE. HE
INDICATED THAT HE WANTED ME TO REVOKE
PERMITTING PRIVILEDGES FOR COCHRAN UNTIL
THEY REPAIRED HIS ROOF. I REPLIED THAT
I WOULD NOT BE ABLE TO DO SO IF HIS ROOF
WAS OUT OF WARRANTY. HE WAS GOING TO
CHECK HIS CONTRACT AND GET BACK WITH ME.
I ADVISED HIM TO GET HIS ROOF REPAIRED
AS SOON AS POSSIBLE TO PREVENT FURTHER
DAMAGE TO HIS HOME.
11-25-201502:24 PMUPDATE/NOTESSPOKE BY PHONE WITH DON COCHRAN AND HE
INDICATED THAT THEY MAY BE WILLING TO DO
REPAIRS TO ROOF EVEN THOUGH IT IS OUT OF
WARRANTY. THEY WANTED ME TO CHECK WITH
COUNTY ATTORNEY ROSS MACBETH TO BE SURE
THAT IF REPAIRS WERE DONE THAT IT WOULD
NOT ACTIVATE ANOTHER WARRANTY PERIOD.
SHORTLY AFTER THAT PHONE CALL I RECEIVED
A CALL FROM MR. BREZINA ASKING WHEN HIS
ROOF MIGHT BE REPAIRED. I TOLD HIM I
HAD BEEN IN CONTACT WITH COCHRAN ROOFING
AND THAT I BELIEVED THAT REPAIRS WOULD
BE MADE WITH STIPULATIONS UPON
COMPLETION. HE SAID THAT THE ROOF IS
STILL LEAKING AND THAT THE TEMPORARY
MEASURES HE HAD TAKEN WERE NOT KEEPING
THE WATER OUT OF HIS HOME. I TOLD HIM
THAT HE NEEDED TO TAKE WHATEVER MEASURES
NECESSARY TO KEEP THE WATER OUT OF HIS
HOUSE AND THAT FURTHER DAMAGE WAS NOT
THE RESPONSIBILITY OF THE BUILDING
DEPARTMENT NOR THE ROOFER. I TOLD HIM
THAT I WOULD BE IN TOUCH WITH HIM THE
FIRST OF THE WEEK REGARDING THE
SITUATION. I THEN SPOKE BY PHONE WITH
ROSS MACBETH AND HE INDICATED THAT
REPAIRS DONE OUTSIDE OF WARRANTY WOULD
NOT TRIGGER A NEW WARRANTY PERIOD. I
WILL CONTACT COCHRAN ROOFING ABOUT THIS
CONCERN THAT THEY HAD AND TRY TO WORK
OUT A AMICABLE SOLUTION.
11-19-201507:19 PMINITIAL INSPECTIONOFFICE RECEIVED PHONE CALL FROM HOWARD
SEIBERT CONCERNING ROOF PROBLEMS. I WAS
INFORMED BY OFFICE STAFF THAT ROOF HAD
BEEN INSTALLED IN 2009 AND HAD BEEN
BEFORE THE CLEAB BOARD AT THAT TIME
BECAUSE OF LEAK ISSUES. I RESEARCHED
THE PERMIT AND CLEAB MINUTES AND FOUND
THAT THE PERMIT WAS ISSUED TO COCHRAN
ROOFING IN MARCH OF 2009 LISTING HOWARD
SEIBERT AS OWNER. A ROOF NAIL OFF
AFFIDAVIT WAS SIGNED BY COCHRAN ROOFING
FOR THIS JOB. A DRY IN INSPECTION WAS
PERFORMED AND PASSED ON 3/29/2009, A
FINAL INSPECTION WAS PERFORMED ON
3/30/2009 AND WAS CANCELED WITH A NOTE
THAT ROOF WAS LEAKING. ANOTHER FINAL
INSPECTION WAS SCHEDULED FOR 4/08/2009
BUT NO ENTRY WAS POSTED AND I DO NOT
KNOW IF THIS INSPECTION WAS PERFORMED.
THE MINUTES FROM THE 6/2/2009 CLEAB
MEETING NOTE THAT A COMPLAINT WAS HEARD
FROM HOME OWNER JERRY BREZINA AGAINST
COCHRAN ROOFING CONCERNING LEAKS AROUND
THE CHIMNEY OF NEW ROOF. MR. BREZINA WAS
NOT IN ATTENDANCE BECAUSE HE HAD TO
RETURN TO MICHIGAN. MOTION WAS MADE TO
SUSPEND PERMITTING PRIVILEDGES UNTIL
COCHRAN REPAIRED ROOF PROBLEMS. COCHRAN
AGREED TO PERFORM REPAIRS AND MOTION WAS
WITHDRAWN AND REPLACED WITH MOTION FOR
COCHRAN TO APPEAR AT JULY MEETING WHICH
PASSED UNANIMOUSLY. A LETTER OF
ADMINISTRATIVE REVIEW FROM SY MOSELEY
STATES THAT ON 6/3/2009 COUNTY ATTORNEY
ROSS MACBETH INFORMED HIM THAT THE
BOARDS ACTION WAS UNENFORCABLE BECAUSE
MR. BREZINA WAS NOT IN ATTENDANCE. THE
7/7/2009 CLEAB MINUTES SHOW A DISCUSSION
OF THE COUNTY ATTORNEYS ACTIONS AND THE
BOARDS REQUEST FOR THE COUNTY ATTORNEY
TO COME AND PROVIDE GUIDANCE FOR FUTURE.
THE 8/4/2009 CLEAB MINUTES SHOW THE
COUNTY ATTORNEY BEING PRESENT PROVIDING
EXPLANATION AND OFFERING PROCEDURES FOR
FUTURE. NO OTHER ACTION FROM THE BOARD
IS SHOWN IN THIS CASE THROUGH 2010 CLEAB
MINUTES.
I MET WITH MR. SEIBERT ON SITE ON
11/18/2015 AND HE RECOUNTED THE ENTIRE
SCENARIO FROM 2009. APPARENTLY COCHRAN
PAID TO HAVE THE CHIMNEY STUCCOED AND
THAT REPAIRED THE LEAK PROBLEM AND
NOTHING FURTHER CAME OF THE COMPLAINT.
I OBSERVED THE NEW STUCCO ON THE CHIMNEY
THAT HAD BEEN DONE IN 2009 AND INFORMED
OWNER THAT IT NEEDED TO BE PAINTED AS IT
WAS STILL RAW STUCCO AND HE SAID HE WAS
SUPPOSED TO DO THAT BUT HAD BEEN TOLD TO
LET THE STUCCO CURE COMPLETELY BEFORE
AND HAD NOT GOT IT DONE. THE ISSUE AT
THIS TIME IS THE FLAT DECK PORTION ON
THE REAR OF THE HOUSE. COCHRAN HAD
INSTALLED 3/4" RIGID INSULATION OVER THE
DECK AND INSTALLED RUBBER MEMBRANE OVER
THE INSULATION. ALONG THE EDGES THEY
INSTALLED 1X2 FIRRING TO ATTACH THE DRIP
EDGE TO. THE RUBBER MEMBRANE WAS
WRAPPED OVER THE EDGE AND PROPERLY
ATTACHED THROUGH THE DRIP EDGE TO THE
1X2. OVER TIME THE 1X2 SEPERATED FROM
THE ORIGINAL DECKING AND THE WIND GOT
UNDER THE MEMBRANE AND ABOUT 1/3 RD OF
THE MEMBRANE FOLDED BACK ACROSS THE ROOF
FROM ONE CORNER. THIS HAPPENED WHILE
MR. SEIBERT WAS OUT OF TOWN AND HE CAME
HOME TO A FLOODED HOME AND WATER DAMAGE
IN THE HOUSE. THE HOME SITS ON A LAKE
AND WINDS ARE MULTIPLIED ACROSS THE
WATER BUT ROOF STILL SHOULD HAVE
SUSTAINED THESE FORCES. I ASKED MR.
SEIBERT WHAT HE WOULD LIKE TO HAVE DONE
AT THIS POINT, AND HE SAID HE WOULD LIKE
TO HAVE HIS ROOF REPAIRED. HE SAID HE
WOULD TAKE CARE OF THE REPAIRS INSIDE
BUT WOULD JUST LIKE THE ROOF REPAIRED.
I ASKED HIM IF, CONSIDERING THE FORMER
CIRCUMSTANCES, HE WANTED COCHRAN TO DO
THE REPAIRS. HE STATED THAT HE WAS
GIVEN A LIFETIME WARRANTY AND THAT HE
WANTED THE WARRANTY HONORED. I TOLD HIM
THAT I WOULD CONTACT COCHRAN AND GET
BACK WITH HIM AS HE DID NOT WANT TO
CONTACT THEM HIMSELF. I WENT BY COCHRAN
ROOFINGS OFFICE BUT NO ONE WAS THER SO I
CALLED AND LEFT A MESSAGE WHICH THEY
RETURNED. I SPOKE WITH RON COCHRAN BY
PHONE AND REQUESTED A FACE TO FACE
MEETING BECAUSE THIS WAS GOING TO STIR
UP OLD WOUNDS. HE PRESSED ME AND I TOLD
HIM WHO IT INVOLVED AND HE WAS FAIRLY
ADAMANT THAT THEY WOULD NOT DO ANY MORE
WORK FOR THAT CUSTOMER AND RECOUNTED THE
PAST HISTORY. I REITERATED THAT I WOULD
LIKE TO HAVE A MEETING WITH THEM AND HE
SAID HIS BROTHER WAS OUT OF TOWN BUT
WOULD BE BACK THIS WEEKEND AND THAT THEY
WOULD CALL ME THE FIRST PART OF THE WEEK
TO MEET. I WILL ATTEMPT TO NEGOTIATE A
WORKABLE SOLUTION BETWEEN OWNER AND
CONTRACTOR.
11-19-201507:19 PMCREATE COMPLAINTCOMPLAINT RECORDED BY ELONGSHO