Case Number CE13100189 complainant  
Case Date 10-25-2013 address  
Origination PHONE - TELEPHONE CALL RECEIVED Status C - CLOSED
Operator mbryant Officer NORTH
Fines Balance $0.00
Lien Balance $0.00
Total Balance $0.00
Property On Case
STRAP NBR C-18-34-29-130-0000-0050 Owner HILDA K COOPER ENTERPRISES LTD
Unit   Owner Address 235 W BRANDON BLVD #128
Property Address 2900 SR 17 City/State/Zip BRANDON FL 33511
City/State/Zip SEBRING FL 33870 Phone  
Case Description
NO PERMIT - REBUILDING/ADDING TO DOCK - THE PARK
OWNER OR MANAGER DOING WORK W/O PERMITS
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
12-28-202001:24 PMUPDATE/NOTESFILE TO RETENTION 9-30-2020 JD / BSS
07-20-201604:30 PMCLOSE COMPLAINTCASE CLOSED BY BSINGLEY
07-20-201604:30 PMREINSPECTION7-20-16 CASE IS DETERMINED THAT THE
DEPARTMENT OF ENVIRONMENTAL IS WORKING
ON REQUIRING THIS OWNER TO GET A
COMMERCIAL USE PERMIT FOR THE DOCK AND
THEY WILL BE REQUIRED TO GET A PERMIT
THROUGH COUNTY BUILDING DEPARTMENT AT
THAT TIME. CE CLOSING CASE SINCE THE
PERMITTING WILL BE GOING THROUGH D.E.P
AND BLD. DEPT. BSS/LC
06-02-201602:53 PMREINSPECTION6-3-16 DOCK IS STILL UNDERWATER AND BLD
INSPECTOR IS NOT ABLE TO INSPECT THE
DOCK AT THIS TIME. BSS/30 MINS,
04-13-201604:58 PMREINSPECTION4-13-16 THE DOCK IS STILL UNDERWATER,
THE SIDE RAILS IS SHOWING, BLD OFFICIAL
NOT ABLE TO DO INSPECTION, BSS
11-13-201509:46 AMREINSPECTION11-13-15 THE DOCK IS STILL UNDER WATER
AND ERIC CAN'T DO THE INSPECTION, BSS/AH
06-12-201502:59 PMREINSPECTION6-12-15 MET AT PROPERTY WITH DR. KILGORE
AND HEIDI HOFFMAN WITH DEP. HEIDI WENT
OVER ALL INFORMATION OF WHAT OWNER
NEEDED TO DO TO GET HIS DOCK PERMITTED
WITH STATE AS WELL AS GET HIS TUA FOR
THE COMMERCIAL DOCK UTILIZATION ON STATE
LANDS. ALSO CE WENT OVER WITH HIM THE
REPAIRS THAT ARE NEEDED TO THE
COMMERCIAL DOCK FOR THE RAILINGS. HE
WILL GET BACK WITH THE BLD OFFICIAL FOR
THE PERSONAL SOUTH END DOCK, HE WOULD
LIKE TO MAKE THE NECESSARY REPAIRS TO
THAT DOCK. HE THINKS HE CAN GET THE
RAILINGS FIX ON COMMERCIAL DOCK WITHIN
TWO WEEKS. BSS/1 HR.
05-21-201504:33 PMREINSPECTIONVISITED SITE AND FOUND DOCK
UNSUBMERGED.
THERE ARE TWO DOCKS AT THIS LOCATION.
THE DOCK TO THE SOUTH IS UNACCESSABLE
FROM LAND AS THE WALKWAY IS MISSING AT
THE LANDWARD PORTION. FROM VISUAL
INSPECTION FROM LAND THIS DOCK APPEARS
TO BE IN SERIOUS DISREPAIR AND SHOULD
BE REMOVED COMPLETELY. THE DOCK TO THE
NORTH IS ACCESSIBLE. THIS IS ALSO AN
OLDER DOCK AND WALKWAY THAT IS IN FAIR
CONDITION. THE DECKING IS OLD AND
WEATHERED BUT INTACT. THE PILINGS AND
STRINGER SYSTEM APPEAR TO BE
STRUCTURALLY SOUND. THE RAILING NEEDS
TO BE STRENGTHENED IN A COUPLE OF
AREAS.
THIS DOCK IS IN USABLE CONDITION AND IS
NOT A SAFETY HAZARD BUT DOES NEED SOME
MAINTENANCE.
05-18-201512:36 PMUPDATE/NOTES5-18-15 RECEIVED EMAIL FROM DEP -
MARY FITZGERALD, OPERATIONS ANALYST, AND
THE LETTER WAS FROM JENNIFER CARPENTER,
ASST. DIRECTOR OF DISTRICT MANAGEMENT
WITH ATTACHED LETTER WHICH IS TO MR.
KILGORE FOR THIS PROPERTY. THE LETTER IS
STATING THAT HE
IS NOT IN COMPLIANCE WITH THE TEMPORARY
USE AGREEMENT (TUA) AND THAT DEP WILL
NOW BEGIN FORMAL ENFROCEMENT
PROCEEDINGS
PURSUANT TO SECTION 120.57(5)F.S. TO
ACHIEVE COMPLIANCE. SENT RETURN EMAIL
TO
JENNIFER WITH DEP THANKING HER FOR THE
INFORMATION AND TO ADVISE THAT THE CE
STILL HAS A CASE FOR THE DOCK, WHICH
HAS
BEEN UNDERWATER AND ONCE THE BUILDING
OFFICIAL AND ONCE THE WATER RECEEDS
THAN
OUR NEW BUILDING OFFICIAL, ERIC
LONGSHORE WILL BE TAKING A LOOK AT THE
ENTIRE DOCK. BSS
04-14-201512:19 PMCHECK FOR COMPLIANCE04-14-15 DOCK IS STILL UNDER WATER AND
RAINY SEASON IS HERE /WILL RE-INSPECT
ONCE WATER RECEEDS/AH FOR BSS
03-02-201502:51 PMREINSPECTION3-2-15 FOUND INSPECTION FROM BLD.
OFFICIAL, UNABLE TO INSPECT UNTIL WATER
RECEEDS. BSS
02-23-201502:25 PMCHECK FOR COMPLIANCEVISITED SITE. FOUND DOCK SUBMERGED UNDER
WATER. FROM VISUAL INSPECTION CAN SEE
SOME DECK BOARDING MISSING. SPOKE WITH
PARK MANAGER, PEGGY, AND SHE EXPRESSED
THAT SHE HAD POSTED DO NOT USE SIGNS AND
THAT RESIDENTS WERE IGNORING THEM AND
TAKING THEM DOWN. POSTED PLACARD
DECLARING UNSAFE STRUCTURE AND WILL
DETERMINE STATUS OF DOCK WHEN WATER
RECEEDS.
10-14-201412:31 PMREINSPECTION10-14-14 SY COULD YOU PLEASE LOOK AT
THIS PROPERTY AND TELL CE IF THE WHOLE
DOCK NEEDS TO BE PERMITTED OR JUST THE
ADDITION. JBOSE WITH STEWARTS
CONSTRUCTION WAS ASKED TO PERMIT THE
DOCK FOR THE OWNER AND HE ASKED TO KNOW
EXACTLY WHAT IS TO BE PERMITTED. PLEASE
NOTIFY CE OF YOUR FINDINGS. BSS
07-07-201410:31 AMUPDATE/NOTES7-7-14 PARK MANAGER, PEGGY CALLED, SPOKE
TO HER AND THEIR MAINTENANCE MAN RE: THE
DOCK. THEY ARE HAVING A HARD TIME
GETTING A CONTRACTOR TO PULL THE PERMIT
FOR THE DOCK. NEED CLARIFICATION FROM
S.Y., BUILDING OFFICIAL IF THE WHOLE
DOCK NEEDS PERMIT OR JUST THE 15' THAT
WAS ADDED. ADVISED PEGGY AFTER CE GETS
CLARIFICATION I WOULD RETURN HER CALL.
BSS/15 MINS.
06-23-201409:59 AMUPDATE/NOTES6-23-14 SPOKE TO JBOSE WHO WORKS FOR
STEWARTS CONSTRUCTION, 863-441-1588. HE
HAS BEEN ASKED BY OWNER OF THIS PROPERTY
IF THEY WOULD GET PERMITS FOR THEIR
COMMERCIAL DOCK. HE ASKED WHAT NEEDS TO
BE BROUGHT UP TO CODE. HE IS NOT SURE
THAT HIS BOSS WILL WANT TO DEAL WITH
THIS ISSUE OF THIS OLDER DOCK. HE WILL
CALL BACK, BSS/15 MINS.
06-16-201402:28 PMUPDATE/NOTES6-16-142 @11:55AM, SENT HEIDI WITH DEP
AN EMAIL ASKING IF DEP PERMIT WAS
ISSUED. SHE HAS FORWARDED THE EMAIL TO
MARK MILLER WITH DEP TO GET THE ANSWER.
ALSO SPOKE TO CAROL IN BLD. DPT.
VERIFIED THAT THERE HAS BEEN NO PERMIT
OBTAINED FOR THE DOCK BUT THEY DID FOR
THE ELECTRICAL BUT NO INSPECTIONS WERE
DONE, SINCE PERMIT WAS ISSUED, BSS
BSS
06-16-201402:15 PMUPDATE/NOTES6-16-14 JOHN KILGORE CALLED, PEGGY THE
PARK MANAGER SHOWED HIM THE WARN. CIT.
FOR NO PERMITS FOR THE DOCK. HE SAID
THAT A LICENSED ELECTRICIAN CORRECTED
AND FINISHED THE ELECTRICAL ISSUES ON
THE DOCK. HE WASN'T SURE IF A PERMIT WAS
PULLED OR NOT, BUT MR. KILGORE WAS HAPPY
WITH THE WORK THAT WAS DONE. HE ALSO
STATED THAT HE HAS BEEN WORKING WITH THE
STATE(DEP) RE: THE DOCK PERMIT. HE
THINKS THE DOCK IS PERMITTED AND SAYS HE
IS NOT GOING TO EXPAND IT ANY FURTHER AS
THIS TIME, IT WILL COST TO MUCH MONEY
RIGHT NOW. EXPLAINED THAT HE DIDNT GET
PERMIT FROM COUNTY. HE ASKED FOR 60 DAYS
TO BE ABLE TO GET THE PERMIT SINCE HE
HAS BEEN ILL AND HAVING TO TRAVEL TO
DOCTORS. ADVISED THAT CE GAVE VERBAL
AGREEMENT TO GET PERMIT SEVERAL MONTHS
AGO BUT NO PERMITS WERE OBTAINED. ALSO
THAT ONCE WARNING IS WRITTEN IT CAN'T BE
WRITTEN FOR NO LONGER THAN 30DAYS. ASKED
MR. KILGORE TO GET BACK WITH
STATE(DEP)TO SEE WHAT WAS NEEDED FOR
DOCK PERMIT AND TRY TO GET THE PERMITS
WITH THE COUNTY AS SOON AS HE COULD,
HOPEFULLY WITHIN THE 30 DAYS THAT WERE
GIVEN. BSS/15 MINS
06-13-201409:55 AMOFFICIAL FORMTED-A.O.P. PRINTED BY BSINGLEY
06-13-201409:51 AMREINSPECTION6-13-14 PARK MANAGER SIGNED WARNING
CIT.#8613 FOR 12.03.101 NO PERMIT
OBTAINED FOR THE DOCK. GAVE PEGGY THE
SHC NOTES FROM S.Y. INSPECTION FROM
SYSTEM. GAVE UNTIL 7-11-14 TO CORRECT.
POSTED ON CEB ON 6-20-14. MAILING
CERTIFIED ON 6-16-14 AND REG. MAIL ON
6-19-14. BSS/1.5 HR
04-17-201404:33 PMUPDATE/NOTES4-17-14 RETURNED CALL TO DAVE CLINE,
863-273-8146. GAVE HIM UPDATE THAT THE
PARK MANAGER, PEGGY IS WORKING WITH MR.
KILGORE TO GET THE PERMITS FROM DEP
FIRST BEFORE GETTING PERMIT WITH COUNTY.
HE BROUGHT UP THAT PEGGY IS NOT THE
MANAGER OF THE MHP AND KILGORE DOESN'T
OWN THE PARK. ADVISED THAT CE WOULD LIKE
COMPLIANCE SO AS LONG AS SOMEONE IS
WORKING ON CORRECTING THE ISSUE, THAT IS
WHAT IS NEEDED. HE FEELS THAT HE CAN'T
MOVE BACK INTO THE PARK DUE TO THE DOCK
BEING UNSAFE. TOLD HIM THAT CE IS
WORKING WITH THE PARK AND THAT THERE ARE
ISSUES AS THE DOCK IS CONSIDERED
COMMERCIAL NEEDS MORE THAN THEY THOUGHT
TO GET PERMITTED. HE WILL CALL BACK WHEN
AND IF HE WANTS TO BE UPDATED. BSS
04-16-201403:14 PMUPDATE/NOTES4/16--DAVID CLINE, 863-273-8146, OR
273-8144, CALLED REGARDING THE BOAT DOCK
THAT WAS BUILT WITHOUT A PERMIT. HE
STATED THAT HE MOVED AWAY FROM THE PARK
DUE TO THE UNSAFE CONDITIONS. HE WANTED
A FOLLOW UP ON THE CASE AND IF THE
OFFICER HAS BEEN OUT AGAIN. HE WOULD
LIKE A CALL BACK FROM THE OFFICER. TED
03-27-201410:19 AMUPDATE/NOTES3-27-14 @ 10:20 PEGGY FROM MHP CALLED
AND SAID THAT MR. CHOQUETTE JUST CAME
AND THREW ALL THE PAPERS BACK AT HER AND
WAS YELLING AND VERY UPSET WITH HER. HE
SAID SHE MADE HIM LOOK LIKE A FOOL
TRYING TO PULL THE PERMIT. SHE WAS
CALLING CE TO ASK FOR SOME HELP OF WHO
SHE COULD HIRE TO HELP PULL THE
COMMERCIAL PERMIT, PLUS SINCE IT IS
ALREADY BEEN BUILT. TRANSFERRED HER TO
BUILDING DEPT. BSS/15 MINS.
03-27-201409:59 AMUPDATE/NOTES3-27-14 CALLED AND SPOKE TO PEGGY, PARK
MANAGER. ADVISED THAT MR. CHOQUETTE CAME
INTO THE OFFICE YESTERDAY AND WAS UPSET
THAT THE TEMP. USE PERMIT FROM DEP WAS
NOT GOING TO BE ABLE TO BE USED FOR THE
DOCK PERMIT. ADVISED HER THAT HEIDI
HOFFMAN WITH DEP SENT EMAIL TO MARK WITH
SOUTH DISTRICT OFFICE OF DEP AND MARK
TOLD HER THAT THE TEMP. USE PERMIT CAN'T
BE USED TO PULL THE PERMIT. PEGGY SAID
THAT SHE WILL GET WITH DR. KILGORE WHO
JUST WENT INTO THE HOSPITAL LAST NIGHT
OR SHE WILL GET WITH THE SURVEYOR WHO
CAME OUT TO THE PROPERTY YESTERDAY. SHE
IS TRYING TO DO WHAT SHE CAN BUT DOESN'T
UNDERSTAND IT ALL. ASKED TO DO WHAT SHE
CAN THAT THIS ISSUE NEEDS TO GET
RESOLVED. BSS/15 MINS.
03-25-201408:35 AMUPDATE/NOTES3-25-14 MR. BOB CHOQUETTE CAME INTO THE
OFFICE TO SEE WHAT WAS NEEDED IN ORDER
TO PULL PERMIT FOR THE ADDITION TO THE
NORTH DOCK FOR THE OWNER OF THE PARK.
TOOK HIM OVER TO BLD. DEPT. SPOKE WITH
CAROL. A CONTRACTOR HAS TO PULL THE
PERMIT, MADE MR. CHOQUETTE COPIES OF THE
DEP PERMIT SHE HAS ALREADY OBTAINED. HE
WILL PULL PERMIT FOR DOCK BUT A LICENSED
ELECTRICIAN WILL HAVE TO DO THE
ELECTRICAL PART OF THE PERMIT. HE WILL
KEEP CE INFORMED. BSS/15 MINS.
02-05-201409:58 AMUPDATE/NOTES2-5-14 SPOKE TO PEGGY, PARK MANAGER,
386-4996. SHE SAID A CONTRACTOR IS
COMING TODAY TO LOOK THE DOCK TO BE ABLE
TO HELP HER GET PERMITS. BSS
01-22-201401:49 PMREINSPECTION1-22-14 NO PERMIT. SPOKE TO PEGGY,
MANAGER OF PARK, 386-4996. SHE HAS
SOMETHING FROM DEP FOR TEMPORARY USE
PERMIT. BUT ADVISED HER THAT TO CORRECT
VIOLATION, SHE NEEDS PERMIT FROM COUNTY
ALSO. SHE WAS GIVEN A COPY OF THE
HISTORY NOTES THAT S.Y. HAS PREPARED.
SHE IS GOING TO HIRE LICENSED CONTRACTOR
TO PULL PERMIT. VERBAL OF 30 DAYS, BSS/1
HR.
12-10-201304:00 PMUPDATE/NOTESTHE PARK MANAGER CAME IN TO SEE WHAT
NEEDS TO BE DONE, SHE CAN NOT PULL THE
PERMIT AS MANAGER. SHE IS CONTACTING A
CONTRACTOR TO WORK WITH HER TO OBTAIN
THE PERMITS AND FINISH THE JOB. SHE IS
ASKING FOR SOME EXTRA TIME TO DO THIS
SINCE SHE PLANS TO BE OUT OF THE AREA
FOR CHRISTMAS. SYM TOLD HER HE WOULD
CHECK WITH CE AND HAVE THEM CALL HER IF
THERE IS A PROBLEM.
10-30-201304:17 PMINITIAL INSPECTIONTHERE ARE TWO WOODEN DOCKS AT THIS
ADDRESS; THE SOUTH DOCK HAS HAD SOME
NEW
BOARDS ADDED TO REPLACE THE OLD ROTTEN
BOARDS. THERE IS NO VIOLATION AT THIS
ONE. THE NORTH DOCK HAS HAD
APPROXIMATELY 14-15 FOOT ADDED TO THE
OLD DOCK. THIS WOULD REQUIRE A PERMIT
AND APPROVAL FROM DEP. THIS PERMIT
NEEDS TO BE OBTAINED ASAP TO PREVENT
FINES FROM ADDING TO THE COST OF THE
PERMIT. THERE IS ALSO A PIECE OF ROMEX
WIRE RUNNING DOWN THE SIDE OF THE DOCK.
NEC REQUIRES THE WIRE TO BE
"PROTECTED",
PLACED IN A CONDUIT PIPE. ALSO THE
RECEPTACLE HAS TO BE GFI PROTECTED BY A
BREAKER OR GFI RECEPTACLE. THE WIRE
ALSO IS NOW UNDERWATER AT ONE POINT AND
NEEDS TO BE RERUN TO LIFT IT OUT OF THE
WATER. THIS CIRCUIT THAT FEEDS THIS
LIGHT AND RECEPTACLE HAS TO BE SHUT OFF
UNTIL THIS IS REPAIRED. *DUPLICATE CASE:
CE13080217
10-25-201303:20 PMCREATE COMPLAINTCOMPLAINT RECORDED BY MBRYANT