Code Enforcement Detail
Code Enforcement Detail
Case Number CE08040144 complainant  
Case Date 04-18-2008 address  
Origination MAIL - MAIL RECEIVED FROM COMPLAINANT Status C - CLOSED
Operator cshackel Officer SY
Fines Balance $0.00
Lien Balance $0.00
Total Balance $0.00
Property On Case
STRAP NBR C-01-33-28-010-0000-7838 Owner HOWARD KENNETH J + KARLA
Unit   Owner Address 3051 W LAKE CHILTON DR
Property Address 3051 W LAKE CHILTON DR City/State/Zip AVON PARK FL 33825
City/State/Zip AVON PARK FL 33825 Phone 4530231
Case Description
RECEIVED COMPLAINT IN MAIL FROM KEN HOWARD AGAINST
MIDWEST FIBERGLASS POOLS FOR POOL PERMIT ISSUED
05/31/07 (07050773) POOL DECK POURED AFTER RED TAG
ISSUED, NO WORK DONE SINCE POURED WRONG ETC.
OWNER HAS PAID $34,500.00 AND JOB NOT RIGHT OR
COMPLETE.
Inspections/Events Detail
DATETIMEINSPECTION / EVENT TYPEINSTRUCTIONS / COMMENTS
07-09-200804:16 PMREINSPECTIONSEE PERMIT 07050773- I INSPECTED SECTION
OF POOL DECK THAT WAS REMOVED. I
RECEIVED A LETTER FROM ENGINEER STATING
FOOTER COULD BE 7" IN WIDTH AND THE
FOOTER MET DESIGN REQUIREMENTS.
05-06-200812:10 PMREINSPECTIONCONTRACTOR CALLED AND SAID POOL DECK
HAD
BEAM REMOVED AND WAS READY TO BE
INSPECTED. FOUND FOOTER INQUESTION TO
NOT BE SIZED AS PER PLAN. I TOLD
CONTRACTOR TO REMOVE REST OF DECK AND
CALL WHEN FOOTER IS CORRECT AND READY
TO
BE INSPECTED. CONTRACTOR SAID THE PLAN
WE WERE USING WAS FOR NORTHERN CLIMATES
THAT REQUIRES THIS FOOTER AROUND EDGE
OF
POOL. HE SAID HE WOULD GET A LETTER
FROM THEIR ENGINEER STATING THE FOOTER
COULD BE OMITTED OR REMOVE THE POOL
DECK. I ADVISED CONTRACTOR I WOULD BE
GONE MAY 13 FOR VACATION BUT OTHER
INSPECTOR COULD CHECK FOOTER IF THEY
REPOUR DECK.

05-01-200812:24 PMINITIAL INSPECTIONI MET WITH THE POOL CONTRACTOR AND OWNER
ON SITE THIS MORNING. THE CONTRACTOR
SET-UP AND SHOT SEVERAL PLACES ON THE
POOL DECK WITH A TRANSIT. THERE WERE
TWO AREAS FOUND WHERE THE DECK DRAINED
TOWARD THE POOL. THE CONTRACTOR AGREED
TO COME BACK NEXT WEEK TO REMOVE THOSE
SECTIONS AND REPOUR THEM WITH THE PROPER
SLOPE. ALSO AT TIME OF REMOVAL THE
BUILDING DEPARTMENT IS TO VERIFY THE
FOOTER AROUND THE POOL SHELL. THE
CONTRACTOR WILL SET-UP THE INSPECTION
WITH THE BUILDING DEPARTMENT WHEN IT IS
READY. MR. HOWARD WAS IN AGREEMENT WITH
THESE STEPS TO BE TAKEN.
04-18-200812:24 PMCREATE COMPLAINTCOMPLAINT RECORDED BY CSHACKEL